VPA 87 - GHG Emission Reduction through use of Bondhu Chula (Improved Cook Stoves) in Bangladesh
GS-4158 ↗ · current registry ID: GS11784
#78of 1329 in Industrial#10of 121 in Bangladesh#174of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard improved cookstove project in Bangladesh with VVB-confirmed additionality and a quantified 5% leakage deduction, but weakened by the absence of a buffer pool, non-conducted FPIC, a project-specific baseline, and a large volume of corrective actions and inter-document contradictions. The conservative usage-rate assumption (0.90 assumed vs 0.9833 verified) and national-default FNRB provide some claim safety, though the 28-year PoA duration and CCP eligibility introduce residual over-crediting and dual-channel risks.
Red Flags
- PoA duration of 28 years exceeds the Gold Standard 20-year maximum; the project relies on transition rules to justify the extension (CAR 02 in the verification report).
- FPIC was not conducted per the 2024 verification report, contradicting the 2023 validation report which recorded it as completed — a material safeguards gap for a household-level project.
- 18+ corrective actions were required across the verification and validation processes, including misaligned emission-reduction figures between the monitoring report and the ER spreadsheet.
- CCP status is 'eligible' while CORSIA eligibility is not stated, creating potential dual-channel credit use without a clear exclusion.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 6,186 | 6,186 | 0 | |
| 2023 | 8,438 | 0 | 8,438 | |
| Total | 14,624 | 6,186 | 8,438 |
Risk Indicators
VVB-confirmed combined test
no reversal data
5% quantified deduction
Project-specific; no reassessment date
Grievance mechanism present; FPIC not conducted
CCP eligible; CORSIA not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →