Wakefield Biochar Facility 1
Score Breakdown
Integrity
verified Uses the Puro.earth Biochar Methodology (v3.1) with a defined monitoring period (issuance document dated 2023-12-22).
missing Permanence and leakage controls (buffer contribution, reversal events, leakage deduction/justification) were not found in the extracted record.
Transparency
verified A VVB is identified (EnergyLink Services Pty Ltd) and the monitoring period is clearly stated (2022-07-01 to 2023-05-31).
missing Key MRV outputs (claimed and verified removals) and monitoring details (e.g., biochar use monitoring approach) were not found in the extracted record.
Claim Safety
verified No material findings were reported in the issuance-related record.
missing A corrective action on LCA feedstock input calculations indicates potential over-crediting risk until corrected.
Documentation
verified Multiple documents were used in extraction (6) and the record is relatively recent (2023-12-22).
missing Evidence document labeling is weak (listed as "unknown") and several critical fields are not found in the extracted record.
Detailed Analysis
Integrity
The project is assessed under the Puro.earth Biochar Methodology (v3.1) with a project-specific baseline approach, which is generally less robust than standardized/jurisdictional baselines (issuance record dated 2023-12-22). Additionality is described as an investment test, but confirmation by the VVB was not found in the extracted record. Permanence-related controls (buffer pool contribution and any reversal reporting) and leakage treatment (deduction and justification) were not found in the extracted record, weakening confidence in net removals.
Transparency
The extracted record provides a named VVB (EnergyLink Services Pty Ltd) and a clear monitoring period (2022-07-01 to 2023-05-31), which supports basic traceability. However, neither the claimed nor verified total removals were found in the extracted record, preventing reconciliation of issuance quantities. The method for monitoring biochar end use (a key determinant of storage durability and double counting risk) was also not found in the extracted record.
Claim Safety
A corrective action was required to review total feedstock input calculations in the LCA for the reported period (issuance record dated 2023-12-22), which can directly change credited removals and increases over-crediting risk. CORSIA eligibility and CCP status were not found in the extracted record, leaving uncertainty about how credits might be marketed and the associated greenwashing risk. Leakage and permanence risk management details were not found in the extracted record, further limiting confidence in conservative net removal claims.
Documentation
The extraction used 6 documents and the key issuance-related record is recent (2023-12-22), supporting moderate documentation strength. Still, the evidence document list is not specific ("unknown"), and many critical quantitative and procedural fields (removal totals, leakage, buffer, safeguards, grievance mechanism) were not found in the extracted record. The minimum extraction confidence is medium, suggesting some limitations in document readability or extraction completeness.
Overall
No contradictions were identified in the extracted record, so there is no need to privilege one document value over another. Overall quality is constrained primarily by evidence gaps on core MRV outputs (claimed/verified removals) and missing risk controls (leakage and permanence), plus an outstanding corrective action affecting LCA feedstock inputs. If documentation were to score below 3.0, transparency would be capped by the gate rule; and if integrity were below 4.0, the overall score would be capped at 6.0 (not applied here).
Audit Analysis
This Puro biochar removal project has some basic integrity signals (named VVB, stated methodology and monitoring window), but key quantitative MRV outputs and risk controls are missing from the extracted record. A corrective action on LCA feedstock input calculations raises over-crediting risk until resolved. Safeguards, leakage treatment, and permanence risk management are not evidenced in the available extracted documents.
Project Description
PUR-654470 — Biomass Removal
Red Flags
- No verified or claimed removal totals were found in the extracted record, limiting the ability to assess crediting accuracy.
- Corrective action required on LCA feedstock input calculations, which can materially affect credited removals.
- Leakage treatment (deduction and justification) not found in the extracted record for a supply-chain-sensitive biochar system.
- Permanence risk controls (e.g., buffer contribution and reversal procedures) not found in the extracted record.
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 3,424 | 3,424 | 0 | |
| Total | 3,424 | 3,424 | 0 |
Cosa migliorerebbe questo punteggio
- Publish or provide the claimed and verified total removals for the monitoring period, including uncertainty/error treatment and reconciliation to issued units.
- Disclose and document permanence and leakage controls (buffer contribution, reversal procedures, leakage deduction and justification) and the biochar end-use monitoring approach.
- Close the corrective action by providing corrected LCA feedstock input calculations and showing the impact (if any) on credited removals.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
Investment test stated; VVB confirmation not evidenced
Buffer/reversal controls not evidenced in extracted record
Leakage deduction and justification not evidenced
Project-specific baseline; reassessment timing not evidenced
FPIC/grievance/safeguards not evidenced
CORSIA/CCP status not evidenced
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →