Wangxingzhuang CMM Power Generation Project
#123of 189 in Methane#899of 1084 in China#1027of 1339 in Verra (VCS)#21of 35 in ACM0008
Audit Analysis
The Wangxingzhuang CMM power generation project has a VVB-confirmed additionality assessment and a reasonable no-reversal-risk profile for a combustion-based project, but suffers from a notable contradiction on whether methane capture is legally required, a 0% leakage deduction with only a 'deemed negligible' justification, and the absence of any monitoring data to verify claimed emissions reductions. Eight material findings and corrective actions in the validation report, combined with low extraction confidence, indicate documentation quality issues that temper confidence in the project's data integrity.
Red Flags
- Contradiction between the PDD (2022) stating methane capture is legally required and the validation report (2024) stating it is not — if the PDD is correct, additionality is compromised
- No monitoring reports or verified ERR figures available; the 551,920 tCO2e lifetime claim is entirely unverified against actual performance
- Leakage deduction of 0% justified only as 'deemed negligible' without quantified analysis, despite CMM projects having plausible leakage pathways (e.g., uncollected methane from adjacent seams)
- Eight material findings in the validation report, including inconsistencies in construction dates, O&M costs, and missing coal mine operational details
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed but PDD contradicts on legal requirement
mixed evidence / unresolved risk
0% deduction, 'deemed negligible' only, no quantification
Project-specific modeled baseline, not yet due for reassessment
Grievance mechanism and benefit sharing present; FPIC not stated
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →