Skip to main content
ScoredCDMEE own generationIndiaRegistry: RegisteredACM0004

Waste Heat Recovery Power Project at JK Cement Works (Unit of JK Cement Limited), Nimbahera, Chittorgarh, Rajasthan

Developer: JK Cement Limited (JKCL)

CDM-0284 ↗

#78of 1536 in Industrial#449of 2263 in India#821of 4472 in CDM (UNFCCC)#13of 75 in ACM0004

Assessment

CarbonMeld document-based assessment

01020304 Overall 6.1 / 10 Dimension scores are locked — the faint arcs are empty tracks, not zero scores.

Scale 0–10 · method weights: integrity 35% · transparency 25% · claim safety 25% · documentation 15%.

Analysis

A CDM waste-heat-recovery project at a cement plant with a VVB-confirmed combined additionality test and a reasonable 0% leakage deduction, but undermined by a baseline-method contradiction between the validation report and monitoring report, absent FNRB and usage-monitoring data, and a grid emission factor frozen at 2005 values. The project delivered roughly 59% of its pro-rata ex-ante expectation for the monitored period, which is conservative but highlights weak MRV granularity.

Red Flags

4 red flags detected — Unlock with Premium

Findings

Risk Indicators

Additionality

🔒

Permanence

🔒

Leakage

🔒

Baseline

🔒

Safeguards

🔒

Double-claim

🔒

Risk indicator details are a Premium feature

Score Breakdown

Score factors per dimension are a Premium feature — Unlock with Premium

Detailed Analysis

The detailed per-dimension analysis is a Premium feature — Unlock with Premium

Evidence

Eligibility & market

What can you claim with this credit?

Four checks buyers ask about, from the registry and the Integrity Council (ICVCM).

  • Airlines (CORSIA)

    Not published

    This registry does not publish CORSIA eligibility per project.

  • Integrity label (ICVCM CCP)

    No ICVCM information

    No CCP label and no ICVCM decision found for this project's methodology.

  • Removal or reduction

    Emission reduction or avoidance

    Prevents or reduces emissions — fits contribution claims, not SBTi neutralisation.

    Source: project sector

  • Paris Agreement (Article 6)

    Not published

    This registry does not publish Article 6 authorizations.

Information only, from public sources. Claim rules (CORSIA, SBTi, EU rules on green claims) change: check them before making a public claim. Since 27 September 2026, EU consumer rules do not allow “climate neutral” product claims based on offsets.

Credit Vintages

IssuedRetiredAvailable
2009
33,363033,363
2010
52,508052,508
2011
21,229021,229
2012
53,934053,934
Total161,0340161,034

Where to buy

Got an offer for these credits? Check it against the registry →

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

Profile & governance

Analysis ProvenanceACM0004

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected] →

Contest this rating

Something wrong in the analysis, or a registry document we have not used? Send us the link to the public source: you get a reference and an answer within 30 days.

Contest this rating →