"Waste Heat Recovery project" at Saraikela, Kharsavan, Jharkhand by M/s Kohinoor Steel Private Limited
#102of 1329 in Industrial#234of 975 in India#297of 1459 in CDM (UNFCCC)#5of 28 in ACM0004
Audit Analysis
A CDM waste heat recovery project at a steel plant in Jharkhand, India, validated by TÜV NORD CERT with a confirmed combined additionality test and a standard ACM0004 methodology. The project's core design is sound, but seven corrective action requests during validation, a single short monitoring period delivering only ~70% of the pro-rata expectation, and several unquantified parameters (FNRB, usage rate, verified ERR) limit confidence in the credit claims.
Red Flags
- Seven corrective action requests (CARs) in the validation report, including missing baseline justification, unclear additionality barriers, and an unrealistic crediting period start date — all rectified but indicating weak initial documentation
- The monitoring report (May–Dec 2008) reports 22,976 tCO2e against a pro-rata expectation of ~32,770 tCO2e for that 7-month window, implying the project delivered only ~70% of the expected reduction in the first period
- Internal contradiction within the same monitoring report: baseline method described as both 'project-specific' and 'jurisdictional'
- No verified ERR figure found in the extracted record; only the PDD ex-ante estimate (393,235 tCO2e lifetime) and one monitoring-period figure (22,976 tCO2e) are available
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversal risk
Deemed negligible, justified
Project-specific, internal inconsistency in MR
Mentioned, benefit sharing described, FPIC/grievance not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →