Skip to main content
ICRAvoidance / ReductionINAMS-II.I

Waste Management at Six Locations in India

ICR-336 ↗

#946of 1329 in Industrial#5of 9 in IN#62of 154 in Intl. Carbon Registry (ICR)#42of 72 in AMS-II.I

4.5/ 10
Integrity
4.5
Transparency
4.5
Claim Safety
5.0
Documentation
3.5

Audit Analysis

This ICR-registered waste management project in India has a VVB-verified additionality assessment and no reported reversals, but is undermined by 16 material findings, a 0% buffer pool, a project-specific modeled baseline, and a significant discrepancy between the validation report's ERR (452,941) and the issuance record (778,776). The project delivered roughly 45% of its pro-rata lifetime expectation for the elapsed monitoring period, reducing over-crediting risk but raising questions about the robustness of the ex-ante estimate. The volume of corrective actions (21) and the Puducherry land-use issue (reclaimed land used for fresh waste dumping without methane recovery) are serious integrity concerns.

Red Flags

  • 16 material findings (NC 01–NC 16) spanning additionality, baseline, monitoring, and documentation, with 21 corrective actions required before the validation report could be finalised
  • ERR contradiction: the validation report (2026-08-04) records 452,941 tCO₂e while the issuance record (2026-08-03) shows 778,776 tCO₂e — a 72% gap that is unexplained
  • 0% buffer pool for a 10-year crediting period in a waste-management project, with no reversal-risk hedge
  • Puducherry site: reclaimed land was provided for fresh waste dumping without methane recovery (NC 01), undermining the baseline avoidance claim
  • Leakage deduction of 0% justified only as 'deemed negligible' with no quantified analysis in a project type where off-site disposal or transport leakage is plausible

Credit Vintages

IssuedRetiredAvailable
2021
282,1500282,150
2022
334,9730334,973
2023
362,8900362,890
2024
362,8900362,890
2025
362,8900362,890
2026
362,8900362,890
2027
362,8900362,890
2028
362,8900362,890
2029
362,8900362,890
2030
362,8900362,890
2031
362,8900362,890
Total3,883,13303,883,133

Risk Indicators

Additionality

VVB-verified but gaps in Level 2a/3 demonstration (NC 03, NC 12)

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, 'deemed negligible' only, no quantified analysis

Baseline

Project-specific modeled baseline, no reassessment date, Puducherry issue (NC 01)

Safeguards

FPIC conducted, grievance mechanism present, benefit sharing described

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-08AMS-III.AF.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents