Water filter project in Dindori, Madhya Pradesh, India
GS-4212 ↗ · current registry ID: GS12220
#22of 108 in Water#277of 975 in India#296of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard water-filter avoidance project in Dindori, India, with VVB-confirmed additionality and no reversal events, but undermined by significant inter-document contradictions in the functional net replacement benefit (a 100× discrepancy), usage rate, and claimed ERR figures. The project delivered roughly 60% of its pro-rata ex-ante expectation for the monitoring period, which is conservative, yet the data-quality issues and a project-specific baseline with a 0% leakage deduction limit confidence in the underlying claims.
Red Flags
- FNRB value differs by a factor of 100 between the verification report (89.2) and the monitoring report (0.892), and the method is described as 'local field' in one document and 'national default' in the other — a fundamental parameter inconsistency that undermines confidence in the emission-factor basis.
- Usage rate is reported as 100 in the verification report and PDD but as 1 in the monitoring report, a 100× discrepancy that could indicate a unit or decimal-place error but is unresolved in the extracted record.
- Two monitoring reports (dated 2025-02-05 and 2025-02-11) give different claimed ERR figures (5,745 vs 3,155); the verification report confirms 3,155, but the origin of the higher figure is unexplained.
- Leakage deduction is 0% with a 'deemed negligible' justification, which is thin for a water-filter project where households could revert to unsafe water sources.
- Seven corrective action requests and four clarification requests were raised during verification, including a missing stakeholder-invitation record for category E participants.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 2,718 | 785 | 1,933 | |
| 2024 | 437 | 0 | 437 | |
| Total | 3,155 | 785 | 2,370 |
Risk Indicators
Combined test, VVB-confirmed
Avoidance project, no reversals
0% deduction, 'deemed negligible' only
Project-specific, reassessment not yet due
FPIC, grievance mechanism, benefits sharing
CORSIA and CCP status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →