Skip to main content
VCSEnergy industries (renewable/non-renewable sources); Fugitive emissions from fuels (solid, oil and gas)China Registry: RegisteredAM0009

Weibei Pipeline Associated Gas Recovery Project

VCS-4508 ↗

#34of 189 in Methane#359of 1084 in China#431of 1339 in Verra (VCS)

5.5/ 10
Integrity
6.0
Transparency
5.0
Claim Safety
5.5
Documentation
5.5

Audit Analysis

The Weibei Pipeline Associated Gas Recovery Project is a straightforward fugitive methane capture activity under VCS methodology AM0009 v7.0, with additionality confirmed by the VVB via a combined test. However, one corrective action on financial indicators remains open, leakage is deemed negligible without quantification, and several contradictions between the PDD and validation report (including a 10× discrepancy in the lifetime ERR figure) introduce data-reliability concerns. The project is newly registered with no monitoring reports yet available, limiting the ability to verify delivery against claims.

Red Flags

  • One corrective action remains open: financial indicators and IRR data required under Tool 27 for the additionality analysis were not provided at validation.
  • The PDD reported a lifetime ERR of 3,541,521 tCO2e while the validation report states 354,152 tCO2e — a tenfold discrepancy that, although corrected in the VR, signals a data-quality weakness in the project documentation chain.
  • Leakage is set at 0% and justified as 'deemed negligible' without a quantified assessment, despite the project type (associated gas capture) where displaced gas could theoretically be combusted elsewhere.
  • Free, Prior and Informed Consent (FPIC) was not conducted, although a grievance mechanism and benefit-sharing description are present.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-verified combined test, but one CAR on financial indicat

Permanence

Fugitive-emissions capture; no non-permanence risk applicabl

Leakage

0% deduction, deemed negligible, no quantified screening

Baseline

Project-specific modelled baseline; reassessment not yet due

Safeguards

Grievance mechanism and benefit-sharing present; FPIC not co

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-30AM0009

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents