Skip to main content
VCSLivestock, enteric fermentation, and manure management; Waste handling and disposalChina Registry: RegisteredAMS-III.F

WEIYUAN COMPOSTING PROJECT

VCS-4612 ↗

#192of 1329 in Industrial#306of 1084 in China#372of 1339 in Verra (VCS)#10of 43 in AMS-III.F

5.6/ 10
Integrity
5.8
Transparency
5.5
Claim Safety
5.8
Documentation
5.2

Audit Analysis

The Weiyuan Composting Project is a VCS-registered manure composting project in China with a VVB-confirmed combined additionality test and verified ERR of 130,822 tCO₂e for the 2022–2024 monitoring period. However, the project-specific baseline, a 0% leakage deduction justified only as 'deemed negligible,' the absence of a stated buffer pool, and multiple corrective action requests (four CARs, eleven corrective actions) indicate moderate data reliability concerns. Several contradictions between the PDD, validation report, monitoring report, and verification report—particularly on the grid emission factor and whether the baseline is measured or modeled—warrant caution before relying on the verified figures.

Red Flags

  • Grid emission factor contradiction: the monitoring report (2025-04-29) uses 0.3297 tCO₂/MWh while the verification report (same date) lists 0.5959 tCO₂/MWh; the two values differ by 81% and directly affect baseline emissions
  • Non-permanence risk analysis is marked N/A in the verification report and no buffer pool percentage is stated in any available document, leaving reversal risk unquantified
  • Four Corrective Action Requests were raised by the VVB (CTI), including an incorrect MCFj value in the baseline calculation and an unjustified new parameter (ρfuel), indicating the project documentation contained material errors at the time of verification
  • Leakage deduction is 0% with a justification of 'deemed negligible,' yet the monitoring report characterises the same treatment as 'quantified'—the inconsistency weakens confidence in the leakage assessment for a composting project where unapplied compost could still emit methane
  • FPIC status is contradictory: the verification report (2025-04-29) confirms FPIC was conducted, while the PDD (2024-05-16) states it was not; the more recent VR is privileged but the discrepancy is unresolved

Credit Vintages

IssuedRetiredAvailable
2022
35,01032,4532,557
Total35,01032,4532,557

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, weak justification

Baseline

Project-specific, measured vs modeled conflict

Safeguards

FPIC confirmed but contradicted; grievance present; benefit

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-30AMS-III.F v12.0 and AMS-III.D v21.0

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents