Wind Power Project by Green Infra Wind Power Generation Limited
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB, and the project uses ACM0002 with a combined additionality test in the verification record.
missing The monitoring and verification files contain several corrective-action items and inconsistencies, including emission reduction and meter-data mismatches, which weaken confidence in the baseline and reported reductions.
Transparency
verified The monitoring period, verifier name, and claimed versus verified emission reductions are stated, and the claimed and verified totals match at 84,562.
missing Public-facing completeness is limited by missing usage-monitoring details, no stated baseline reassessment date, and low extraction confidence from the document set.
Claim Safety
verified The project shows no over-issuance in the latest record because claimed and verified emission reductions are identical at 84,562.
missing Claim safety is weakened by unresolved leakage treatment, a project-specific baseline, and contradictions in reported emission reductions across documents.
Documentation
verified A relatively large evidence set was used, with 37 documents referenced and a named VVB in the record.
missing Documentation quality is reduced by low extraction confidence, an unknown evidence-doc list, and multiple corrective actions that had to be raised and resolved.
Detailed Analysis
Integrity
The verification report confirms additionality through a combined test and states that the VVB, SGS India Private Limited, accepted the project. The project also reports a leakage deduction of 0% and says reversal events are not applicable to the activity, which is favorable for permanence in an avoidance project. That said, the record includes several material findings and corrective actions about emission reduction inconsistencies, vintage dates, and meter serial numbers, which lowers confidence in the robustness of the quantified reductions.
Transparency
The monitoring period is clearly stated as 2024-05-01 to 2024-10-31, and the latest record shows claimed and verified emission reductions both at 84,562. However, usage-monitoring method details are not found in the extracted record, baseline reassessment timing is not stated, and the extraction confidence is low, which weakens transparency. The registry status is available, but the documentation still leaves important MRV details incomplete.
Claim Safety
Claim safety is helped by the fact that the latest claimed and verified emission reductions are identical, which reduces immediate over-crediting concern. Still, the baseline is project-specific rather than jurisdictional, leakage is described as not addressed in the extracted record, and the contradiction log shows earlier documents with different emission reduction totals. Because of these inconsistencies, the project’s claim safety is only moderate.
Documentation
The file set is broad, with 37 documents used and a named verifier, which is a positive sign. But the extraction confidence is low, one evidence document is not identified, and the record contains several corrective actions and reopened clarifications, indicating that the documentation trail is not clean. The crediting period is long relative to the monitoring period, but the recency of the latest issuance material does not fully offset the quality concerns.
Overall
The project looks operationally credible, but the evidence quality is only middling because the record contains multiple inconsistencies and a low-confidence extraction warning. I privileged the latest issuance record for the 84,562 verified credits because it is the most recent and appears to reflect the resolved monitoring outcome, but I discounted confidence because the contradiction log shows earlier documents with materially different totals and unresolved wording around leakage and safeguards. The contradiction on FPIC is also important: I gave more weight to the later record showing FPIC conducted, but the earlier contrary entry means the safeguard trail is not fully clean.
Audit Analysis
This wind project has some positive integrity signals, including VVB-confirmed additionality, a quantified leakage deduction of 0%, and no reversal events applicable to the activity. However, the record shows several documentation inconsistencies and a low extraction-confidence warning, which reduce trust in the reported figures and weaken the overall claim quality.
Project Description
Proponent: Green Infra Wind Power Generation Limited Protocol categories: Energy industries (renewable/non-renewable sources) Protocols: ACM0002 Estimated annual GHG reductions: 79147 tCO2e Region: Asia Registration date: 2020-12-10
Red Flags
- Multiple CARs and inconsistencies were recorded in the monitoring and verification materials, including mismatches in emission reduction values, vintage dates, and meter details.
- Leakage treatment is weakly supported because the record says leakage was not addressed, and the contradiction log indicates an earlier quantified treatment in another document.
- The evidence set is hard to fully trust because extraction confidence is low and at least one key document was poorly readable.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2016 | 10,638 | 54 | 10,584 | |
| 2017 | 79,951 | 0 | 79,951 | |
| 2018 | 85,651 | 0 | 85,651 | |
| 2019 | 87,800 | 0 | 87,800 | |
| 2020 | 75,495 | 35,939 | 39,556 | |
| 2021 | 76,857 | 48,689 | 28,168 | |
| 2022 | 72,186 | 0 | 72,186 | |
| 2023 | 80,580 | 24,752 | 55,828 | |
| 2024 | 62,639 | 3,722 | 58,917 | |
| Total | 631,797 | 113,156 | 518,641 |
Cosa migliorerebbe questo punteggio
- Publish a clean, reconciled monitoring package that resolves all CARs and aligns emission reduction totals, vintage dates, meter identifiers, and ER sheet values across documents.
- Provide explicit leakage and safeguard documentation, including a clear leakage rationale, complete FPIC evidence, and a fully traceable public MRV package with readable source documents.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed additionality test
Avoidance project; no reversal events applicable
Leakage deduction stated, but justification is weak
Project baseline stated; reassessment timing missing
FPIC and grievance mechanism present, but trail is inconsist
CORSIA/CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →