Wind Power Project by Green Infra Wind Power Generation Limited

VCS-1776 ↗

5.2 / 10
Integrity
5.7
Transparency
5.0
Claim Safety
5.2
Documentation
4.1

Score Breakdown

Integrity

verified Additionality was confirmed by the VVB, and the project uses ACM0002 with a combined additionality test in the verification record.

missing The monitoring and verification files contain several corrective-action items and inconsistencies, including emission reduction and meter-data mismatches, which weaken confidence in the baseline and reported reductions.

Transparency

verified The monitoring period, verifier name, and claimed versus verified emission reductions are stated, and the claimed and verified totals match at 84,562.

missing Public-facing completeness is limited by missing usage-monitoring details, no stated baseline reassessment date, and low extraction confidence from the document set.

Claim Safety

verified The project shows no over-issuance in the latest record because claimed and verified emission reductions are identical at 84,562.

missing Claim safety is weakened by unresolved leakage treatment, a project-specific baseline, and contradictions in reported emission reductions across documents.

Documentation

verified A relatively large evidence set was used, with 37 documents referenced and a named VVB in the record.

missing Documentation quality is reduced by low extraction confidence, an unknown evidence-doc list, and multiple corrective actions that had to be raised and resolved.

Detailed Analysis

Integrity

The verification report confirms additionality through a combined test and states that the VVB, SGS India Private Limited, accepted the project. The project also reports a leakage deduction of 0% and says reversal events are not applicable to the activity, which is favorable for permanence in an avoidance project. That said, the record includes several material findings and corrective actions about emission reduction inconsistencies, vintage dates, and meter serial numbers, which lowers confidence in the robustness of the quantified reductions.

Transparency

The monitoring period is clearly stated as 2024-05-01 to 2024-10-31, and the latest record shows claimed and verified emission reductions both at 84,562. However, usage-monitoring method details are not found in the extracted record, baseline reassessment timing is not stated, and the extraction confidence is low, which weakens transparency. The registry status is available, but the documentation still leaves important MRV details incomplete.

Claim Safety

Claim safety is helped by the fact that the latest claimed and verified emission reductions are identical, which reduces immediate over-crediting concern. Still, the baseline is project-specific rather than jurisdictional, leakage is described as not addressed in the extracted record, and the contradiction log shows earlier documents with different emission reduction totals. Because of these inconsistencies, the project’s claim safety is only moderate.

Documentation

The file set is broad, with 37 documents used and a named verifier, which is a positive sign. But the extraction confidence is low, one evidence document is not identified, and the record contains several corrective actions and reopened clarifications, indicating that the documentation trail is not clean. The crediting period is long relative to the monitoring period, but the recency of the latest issuance material does not fully offset the quality concerns.

Overall

The project looks operationally credible, but the evidence quality is only middling because the record contains multiple inconsistencies and a low-confidence extraction warning. I privileged the latest issuance record for the 84,562 verified credits because it is the most recent and appears to reflect the resolved monitoring outcome, but I discounted confidence because the contradiction log shows earlier documents with materially different totals and unresolved wording around leakage and safeguards. The contradiction on FPIC is also important: I gave more weight to the later record showing FPIC conducted, but the earlier contrary entry means the safeguard trail is not fully clean.

Audit Analysis

This wind project has some positive integrity signals, including VVB-confirmed additionality, a quantified leakage deduction of 0%, and no reversal events applicable to the activity. However, the record shows several documentation inconsistencies and a low extraction-confidence warning, which reduce trust in the reported figures and weaken the overall claim quality.

Project Description

Proponent: Green Infra Wind Power Generation Limited Protocol categories: Energy industries (renewable/non-renewable sources) Protocols: ACM0002 Estimated annual GHG reductions: 79147 tCO2e Region: Asia Registration date: 2020-12-10

Red Flags

  • Multiple CARs and inconsistencies were recorded in the monitoring and verification materials, including mismatches in emission reduction values, vintage dates, and meter details.
  • Leakage treatment is weakly supported because the record says leakage was not addressed, and the contradiction log indicates an earlier quantified treatment in another document.
  • The evidence set is hard to fully trust because extraction confidence is low and at least one key document was poorly readable.

Credit Vintages

Issued Retired Available
2016
10,638 54 10,584
2017
79,951 0 79,951
2018
85,651 0 85,651
2019
87,800 0 87,800
2020
75,495 35,939 39,556
2021
76,857 48,689 28,168
2022
72,186 0 72,186
2023
80,580 24,752 55,828
2024
62,639 3,722 58,917
Total 631,797 113,156 518,641

Cosa migliorerebbe questo punteggio

  • Publish a clean, reconciled monitoring package that resolves all CARs and aligns emission reduction totals, vintage dates, meter identifiers, and ER sheet values across documents.
  • Provide explicit leakage and safeguard documentation, including a clear leakage rationale, complete FPIC evidence, and a fully traceable public MRV package with readable source documents.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed additionality test

Permanence

Avoidance project; no reversal events applicable

Leakage

Leakage deduction stated, but justification is weak

Baseline

Project baseline stated; reassessment timing missing

Safeguards

FPIC and grievance mechanism present, but trail is inconsist

Double-claim

CORSIA/CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-19 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti