Wudi Lvhe Composting project
#589of 1329 in Industrial#657of 1084 in China#759of 1339 in Verra (VCS)#22of 43 in AMS-III.F
Audit Analysis
The Wudi Lvhe Composting project is a VCS-registered livestock manure management project in China with a confirmed investment-test additionality and inherently low permanence risk typical of waste-avoidance methodologies. However, the verification report lists 14 material findings and 14 corrective actions, the project delivered only ~74% of its pro-rata ex-ante expectation for the elapsed monitoring period, and several key parameters (FNRB, buffer pool, usage monitoring) are absent from the record. Four cross-document contradictions—particularly the FPIC status and baseline characterisation—undermine confidence in the data trail.
Red Flags
- 14 material findings in the verification report, including missing government approvals (EIA, Pollutant Discharge Permit), inconsistent livestock type, and missing monitoring parameters
- FPIC status contradicts between the monitoring report (not conducted) and the verification report (conducted) — a serious safeguard discrepancy
- Baseline characterisation contradicts between the validation report (modelled) and the verification report (measured)
- 0% leakage deduction justified only as 'deemed negligible' with no quantified analysis
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
mixed evidence / unresolved risk
0% deduction, 'deemed negligible' only
Project-specific, measured; reassessment not yet due
FPIC contradiction; grievance mechanism present
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →