Wuhan Chenjiachong Landfill Gas Power Generation Project Phase II

VCS-2957 ↗

#41of 189 in Methane#411of 1084 in China#493of 1339 in Verra (VCS)#36of 159 in ACM0001

5.4/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
5.5
Documentation
5.5

Audit Analysis

A registered VCS landfill-gas-to-energy project with VVB-confirmed additionality and a measured project-specific baseline, but the verification report (Jan 2025) raised three material findings and nine corrective actions centred on inconsistent monitoring data, unexplained operating-hour gaps, and non-traceable ERR parameters. The 0% leakage deduction is supported by a quantified justification, though the same monitoring report also describes it as 'deemed negligible,' creating an internal inconsistency. Overall the project is structurally sound but carries meaningful data-quality risk that the VVB has flagged for correction.

Red Flags

  • Three material findings in the Jan 2025 verification report: incorrect SDG targets, unexplained reduced operating hours in Apr–May 2024, and non-traceable / inconsistent GHG parameter values between the MR and ERR sheet
  • Nine corrective actions required by the VVB, including missing flare-system instrumentation details and inconsistent ex-ante vs. reported ERR values
  • Leakage justification is internally contradictory within the same monitoring report (2025-01-17): one section states 'quantified' while another states 'deemed negligible'
  • FPIC status is contradictory: the verification report (2025) confirms it was conducted, but the PDD (2022) records it as not conducted
  • Low minimum extraction confidence across the 17-document evidence set, reducing reliability of the structured data

Credit Vintages

IssuedRetiredAvailable
2020
80,9901,74479,246
2021
167,2020167,202
2022
25,274025,274
Total273,4661,744271,722

Risk Indicators

Additionality

VVB-confirmed combined test; capture not legally mandated

Permanence

LFG-specific risk pr

Leakage

0% deduction; justification internally contradictory (quanti

Baseline

Project-specific, measured; no reassessment date stated

Safeguards

Grievance mechanism present; FPIC and benefit-sharing status

Double-claim

CORSIA and CCP eligibility not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-31ACM0001

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents