Wuhan Jiangxia Changshankou LFG Power Project Phase I
#537of 1084 in China#629of 1339 in Verra (VCS)#47of 159 in ACM0001
Audit Analysis
A registered VCS landfill-gas-to-power project in China with VVB-confirmed additionality and a measured baseline, but undermined by three material findings on metering and calibration, a 0% leakage deduction with inconsistent justification, and eight cross-document contradictions. The project delivered roughly 282% of the pro-rata PDD expectation for the elapsed monitoring period, suggesting a conservative ex-ante estimate but also raising questions about monitoring accuracy given the calibration gaps.
Red Flags
- Three material findings in the verification report: backup flow meter removed due to malfunction (Dec 2024), calibration gaps for temperature/pressure transmitters and methane analyzer spanning Feb 2024 to May 2025, and an uncalibrated electricity meter from a sister project (VCS5138).
- Eight contradictions between the PDD, monitoring reports, and verification reports, including conflicting statements on FPIC, grievance mechanism, additionality test type, baseline type, and ERR figures.
- Leakage deduction of 0% is justified as 'deemed negligible' in the monitoring report but marked 'not addressed' in the verification report, creating an inconsistency in the safeguards narrative.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 18,000 | 2,500 | 15,500 | |
| Total | 18,000 | 2,500 | 15,500 |
Risk Indicators
VVB-confirmed investment test
Avoidance project
0% deduction; justification inconsistent across docs
Project-specific, measured; reassessment not yet due
FPIC and grievance confirmed in 2026 VR but contradicted by
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →