Skip to main content
VCSEnergy industries (renewable/non-renewable sources); Mining/mineral productionChina Registry: RegisteredACM0008

Wulihou CMM Power Generation Project

VCS-5411 ↗

#143of 189 in Methane#982of 1084 in China#1125of 1339 in Verra (VCS)#27of 35 in ACM0008

4.2/ 10
Integrity
4.5
Transparency
4.0
Claim Safety
3.5
Documentation
5.0

Audit Analysis

The Wulihou CMM Power Generation Project is a registered VCS methane-to-power project with VVB-confirmed additionality and documented safeguards, but the validation report identifies eight material findings—including an installed-capacity inconsistency, insufficient baseline detail, and a VVB comment questioning the project's fundamental eligibility—along with nine corrective actions. The 0% leakage deduction is justified only as 'deemed negligible' without quantification, and a contradiction exists on whether methane capture is legally mandated, undermining the additionality narrative. No monitoring data is yet available, and the project remains at the validation stage.

Red Flags

  • Eight material findings in the validation report, including an installed-capacity inconsistency and a VVB comment questioning whether this project type should be eligible in the carbon market
  • Contradiction between the PDD (capture legally required: yes) and the validation report (capture legally required: no), directly affecting the additionality case
  • Leakage deduction of 0% justified only as 'deemed negligible' with no quantified analysis for a coal-mine-methane project where displaced methane or alternative use pathways are plausible
  • Nine corrective actions required by the VVB, spanning investment-analysis assumptions, baseline methane-concentration limits, and stakeholder-identification gaps

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-verified but 8 material findings and legal-requirement contradiction

Permanence

Power-generation avoidance; reversal explicitly not applicable

Leakage

0% deduction, 'deemed negligible' without quantified analysis

Baseline

Project-specific, modeled; insufficient alternative-scenario detail flagged

Safeguards

FPIC conducted, grievance mechanism present, safeguards documented

Double-claim

CORSIA eligibility not stated; CCP status not mentioned

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04ACM0008

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.