Wulihou CMM Power Generation Project
#143of 189 in Methane#982of 1084 in China#1125of 1339 in Verra (VCS)#27of 35 in ACM0008
Audit Analysis
The Wulihou CMM Power Generation Project is a registered VCS methane-to-power project with VVB-confirmed additionality and documented safeguards, but the validation report identifies eight material findings—including an installed-capacity inconsistency, insufficient baseline detail, and a VVB comment questioning the project's fundamental eligibility—along with nine corrective actions. The 0% leakage deduction is justified only as 'deemed negligible' without quantification, and a contradiction exists on whether methane capture is legally mandated, undermining the additionality narrative. No monitoring data is yet available, and the project remains at the validation stage.
Red Flags
- Eight material findings in the validation report, including an installed-capacity inconsistency and a VVB comment questioning whether this project type should be eligible in the carbon market
- Contradiction between the PDD (capture legally required: yes) and the validation report (capture legally required: no), directly affecting the additionality case
- Leakage deduction of 0% justified only as 'deemed negligible' with no quantified analysis for a coal-mine-methane project where displaced methane or alternative use pathways are plausible
- Nine corrective actions required by the VVB, spanning investment-analysis assumptions, baseline methane-concentration limits, and stakeholder-identification gaps
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-verified but 8 material findings and legal-requirement contradiction
Power-generation avoidance; reversal explicitly not applicable
0% deduction, 'deemed negligible' without quantified analysis
Project-specific, modeled; insufficient alternative-scenario detail flagged
FPIC conducted, grievance mechanism present, safeguards documented
CORSIA eligibility not stated; CCP status not mentioned
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →