WWF Ningshan County High Efficient Cook Stove Project
GS-344 ↗ · current registry ID: GS2429
#414of 1329 in Industrial#535of 1084 in China#661of 1801 in Gold Standard (GS)#79of 189 in AMS-II.G
Audit Analysis
A Gold Standard cook-stove project with a confirmed investment-test additionality and conservative fNRB of 100%, but undermined by eight material findings, 23 corrective actions, and multiple cross-document contradictions in ERR figures, crediting period, and FPIC status. The project delivered roughly 80% of its pro-rata ex-ante expectation, indicating no over-crediting, yet the absence of a stated buffer pool and the project-specific baseline leave residual permanence and baseline-validity concerns.
Red Flags
- Site visit gap exceeded three years; credits for the period prior to three years before the site visit were excluded from the claim (material finding in the 2026 verification report).
- Twenty-three corrective actions were required, spanning missing equipment calibration records, unclear survey methodology, inconsistent thermal-efficiency values (25% vs 28.9%), and unreadable source documents.
- Crediting period is stated as 2013–2023 (10 years) in the 2026 verification report but 2015–2046 (31 years) in the 2018 monitoring report — a fundamental scope discrepancy.
- FPIC is recorded as conducted in the 2018 verification report but not conducted in the 2020 monitoring report, creating uncertainty about free, prior, and informed consent.
- No buffer pool percentage is stated in any available document, leaving the project's reversal risk (stove breakdown, disuse) addressed only by the fNRB factor.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 539 | 539 | 0 | |
| 2014 | 6,467 | 6,467 | 0 | |
| 2015 | 9,653 | 8,304 | 1,349 | |
| 2016 | 8,974 | 8,697 | 277 | |
| 2017 | 6,986 | 6,986 | 0 | |
| 2018 | 1,180 | 1,180 | 0 | |
| 2019 | 7,974 | 7,974 | 0 | |
| 2020 | 5,330 | 5,330 | 0 | |
| 2022 | 4,730 | 0 | 4,730 | |
| 2023 | 3,526 | 0 | 3,526 | |
| Total | 55,359 | 45,477 | 9,882 |
Risk Indicators
VVB-confirmed investment test
mixed evidence / unresolved risk
5% quantified deduction
Project-specific; reassessment timing not stated
FPIC contradiction; grievance mechanism present
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →