Re-assessment pending
Xinjiang Wuqia Xiate Hydro Power Plant Project
- Standard
- GCC
- Methodology
- ACM0002 (CDM)
- Registry
- GCC-1011 ↗ · Registered
- Country
- China
Score from methodology v2.1 (analysis of 26 Sep 2026). Re-assessment under v2.2 pending.
Assessment
Scale 0–10 · method weights: integrity 35% · transparency 25% · claim safety 25% · documentation 15%.
Findings
Evidence
Eligibility & market
What can you claim with this credit?
Four checks buyers ask about, from the registry and the Integrity Council (ICVCM).
Airlines (CORSIA)
Stated in the project documents
The documents claim CORSIA eligibility, but no registry label confirms it: check vintage and authorization.
Source: project documents (not confirmed by the registry) · documents analysed on 26 Sep 2026
Covers: what the project documents state — not a registry record
Integrity label (ICVCM CCP)
No ICVCM information
No CCP label and no ICVCM decision found for this project's methodology.
Removal or reduction
Emission reduction or avoidance
Prevents or reduces emissions — fits contribution claims, not SBTi neutralisation.
Source: project sector
Covers: the project type, not a label on individual credits
Paris Agreement (Article 6)
Not published
This registry does not publish Article 6 authorizations.
Information only, from public sources. Claim rules (CORSIA, SBTi, EU rules on green claims) change: check them before making a public claim. Since 27 September 2026, EU consumer rules do not allow “climate neutral” product claims based on offsets.
Registry labels read on
Credit Vintages
Issuance data not yet available — check back soon.
Where to buy
Got an offer for these credits? Check it against the registry →
+ Know where to buy this?
Listing multiple projects? Send us a CSV at listings@carbonmeld.com.
Profile & governance
Are you the project owner?
Full analysis (free for owners)
Owners get free access to the full analysis of their own project: the reasons behind the score, the red flags and the documents read. Write to us from your organisation's email address.
hello@carbonmeld.com →Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
hello@carbonmeld.com →Contest this rating
Something wrong in the analysis, or a registry document we have not used? Send us the link to the public source: you get a reference and an answer within 30 days.
Contest this rating →Similar projects
Same methodology or sector, the same registry first.
- UAE Wind Program – Phase 1GCC-519
- Jiaxian Fangta 50MW Wind Power ProjectGCC-578
- Rio do Peixe Solar Complex by EnergisaGCC-1207
- Karakurt HEPPGCC-721
- 300 MW Solar Project in RajasthanGCC-1158
- Thinh Long Solar Power ProjectGCC-782
- Manastır-Esenköy WPPGCC-273
- Kayseri OSB SPPGCC-254
