Skip to main content
VCSEnergy industries (renewable/non-renewable sources); Waste handling and disposalTurkey Registry: RegisteredAMS-III.D

Yılmazlar Biogas Power Plant Project

VCS-4205 ↗

#164of 268 in Biogas#256of 295 in Turkey#978of 1339 in Verra (VCS)#57of 105 in AMS-III.D

4.6/ 10
Integrity
4.5
Transparency
4.5
Claim Safety
5.5
Documentation
3.5

Audit Analysis

The Yılmazlar Biogas Power Plant is a registered VCS biogas project with confirmed additionality and inherently low permanence risk, but the verification report contains 27 material findings and 17 corrective actions that raise serious concerns about the robustness of the underlying data. The project delivered roughly 69% of its pro-rata expected reductions for the elapsed monitoring period, which is conservative, yet key parameters such as the functional newness ratio, usage rates, and CORSIA/CCP status remain unstated. Overall, the project is functional but carries elevated documentation and data-reliability risk.

Red Flags

  • 27 material findings and 17 corrective actions in the verification report (2024-03-13) indicate significant gaps in baseline equations, monitoring parameters, double-counting verification, and evidence documentation
  • Biofilters were deemed ineffective and had to be replaced with covered pools (CL#01), suggesting the original design assumptions were not met in practice
  • Contradiction in lifetime ERR: 250,982 tCO₂e (validation report, Jan 2024) vs 281,800 tCO₂e (PDD, Feb 2023) — a ~12% discrepancy between the two documents
  • CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed
  • Functional newness ratio (FNRB) value and method are not stated, preventing independent assessment of the baseline's conservatism

Credit Vintages

IssuedRetiredAvailable
2021
2,30102,301
2022
27,854027,854
2023
6,99506,995
Total37,150037,150

Risk Indicators

Additionality

VVB-confirmed but test type unstated

Permanence

Not AFOLU; no reversal risk

Leakage

Quantified at 0% with justification

Baseline

Project-specific, modeled; no reassessment date

Safeguards

Grievance mechanism and benefit sharing present; FPIC not st

Double-claim

CORSIA and CCP status both unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-31AMS-III.D, AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents