Yamanli II Hydroelectric Power Plant
#1282of 1935 in Renewable energy#243of 295 in Turkey#894of 1339 in Verra (VCS)#997of 1287 in ACM0002
Audit Analysis
The Yamanli II Hydroelectric Power Plant is a VCS-registered renewable energy project with a verified additionality test and jurisdictional baseline, but it carries significant data-reliability concerns. The verified emission reductions (591,568 tCO₂) are roughly 8.4 times the pro-rata ex-ante expectation derived from the validation report, and the verification report lists 13 material findings including errors in the grid emission-factor calculation and a timing flaw in the investment analysis that undermines the additionality case. Multiple cross-document inconsistencies in leakage treatment, crediting-period dates, and calibration records further erode confidence in the reported figures.
Red Flags
- Verified ERR of 591,568 tCO₂ is approximately 8.4× the pro-rata ex-ante expectation (≈70,360 tCO₂) derived from the validation report's 117,266 tCO₂ over the original 10-year crediting period, raising serious over-crediting concerns.
- The investment analysis used input parameters from a revised Financial Sustainability Report (2012) that post-dated the investment decision, undermining the robustness of the investment test (CAR 10).
- The grid emission factor calculation used an arithmetic average instead of the required weighted average (CAR 19), and the BM_EF calculation did not follow the Emission Factor Tool precisely (CAR 20), both of which affect the magnitude of claimed reductions.
- Thirteen material findings and eight corrective actions were identified in the verification report, including a contradiction in calibration records and inconsistent geocoordinates across project documents.
- Leakage justification is inconsistent: the verification report states 'deemed negligible' while the monitoring report indicates leakage was 'quantified'.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed but investment-test timing flawed
Grid-connected HPP – no reversal risk
0% deemed negligible; MR says quantified
Jurisdictional EF but calculation errors flagged
FPIC, grievance mechanism, safeguards documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →