Yangdong Landfill Gas Power Generation Project
#111of 189 in Methane#859of 1084 in China#976of 1339 in Verra (VCS)#103of 159 in ACM0001
Audit Analysis
The Yangdong Landfill Gas Power Generation Project is a registered VCS LFG-to-energy project with a reputable VVB (Applus+) and a confirmed investment additionality test, but it carries six inter-document contradictions—including a critical dispute over whether gas capture is legally mandated—and four unresolved material findings. Verified emissions reductions for the two-year monitoring period (234,938 tCO₂e) represent roughly 91% of the pro-rata lifetime expectation, indicating conservative delivery. The project is functional but its data reliability is weakened by inconsistent reporting across the validation, monitoring, and verification documents.
Red Flags
- Contradiction on whether LFG capture is legally required: the verification report (Aug 2023) states true while the validation report (Apr 2023) states false; if legally mandated, additionality is materially undermined
- Grid emission factor differs by 58% between the validation report (0.50885) and the verification report (0.8042, 2019), directly affecting credit volume
- Four material findings remain, including a monitoring plan that does not meet ACM0001 requirements (CAR 01) and missing parameter FCH4,BL,R,y in ex-ante estimations
- Leakage justification is inconsistent: the verification report calls it 'quantified' while the monitoring report calls it 'deemed negligible', yet the deduction is 0% in both cases
- Gas capture legally mandated — additionality in doubt
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 69,892 | 10,000 | 59,892 | |
| 2022 | 103,507 | 1,100 | 102,407 | |
| 2023 | 3,858 | 0 | 3,858 | |
| Total | 177,257 | 11,100 | 166,157 |
Risk Indicators
VVB-confirmed investment test, but legal-requirement contradiction unresolved
LFG-to-energy; no storage or reversal risk identified
0% deduction; justification inconsistent across documents
Project-specific; measured vs modelled discrepancy; reassessment not yet due
Grievance mechanism and safeguards mentioned; FPIC not stated
CORSIA and CCP statuses not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →