YANGMEI XIN DA DI 16MW CMM POWER GENERATION PROJECT

VCS-5340 ↗

#110of 189 in Methane#858of 1084 in China#974of 1339 in Verra (VCS)#15of 35 in ACM0008

4.6/ 10
Integrity
5.0
Transparency
4.5
Claim Safety
4.0
Documentation
5.0

Audit Analysis

A 16 MW coal-mine-methane power generation project in China under VCS methodology ACM0008, with additionality confirmed by the VVB via a combined test. However, four material findings at validation (including a non-compliant common-practice justification and stakeholder consultation gaps) required corrective action, no buffer pool is in place, and two cross-document contradictions (a 10× discrepancy in the claimed ERR and inconsistent leakage-justification language) reduce confidence in the data record.

Red Flags

  • Four material findings at validation required corrective action, including a common-practice justification that did not meet the Combined Tool requirements and stakeholder consultation inconsistent with VCS Standard v4.7 §3.18
  • 10× discrepancy in the claimed ERR between the validation report (4,837,071 tCO₂e) and the financial document (483,707 tCO₂e)
  • Leakage justification is contradictory: the monitoring report states it was 'quantified' while the validation report characterises it as 'deemed negligible', yet both apply a 0% deduction

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed but common-practice justification was a materi

Permanence

plant-shutdown risk unaddressed

Leakage

0% deduction with contradictory justification language

Baseline

Project-specific modelled baseline; reassessment not yet due

Safeguards

FPIC and grievance mechanism present, but consultation found

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-31ACM0008

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents