Yangquan Guzhuang 8MW CMM Power Generation Project
#132of 189 in Methane#947of 1084 in China#1086of 1339 in Verra (VCS)#25of 35 in ACM0008
Audit Analysis
The Yangquan Guzhuang 8MW CMM power generation project has VVB-verified additionality and established safeguards, but is undermined by five material findings (including a non-compliant TDLi,y parameter and incomplete IRR calculations), a 37% discrepancy in lifetime ERR between the PDD and validation report, a 0% leakage deduction with only a 'deemed negligible' justification, and the absence of a buffer pool or monitoring data. The low extraction confidence and missing monitoring report further limit confidence in the project's data integrity.
Red Flags
- Five material findings in the validation report, including a TDLi,y parameter (3%) that does not comply with TOOL 05 requirements, raising over-crediting risk in project emission calculations
- Lifetime ERR differs by 37% between the PDD (1,748,817 tCO2e) and the validation report (2,403,370 tCO2e), with no clear reconciliation provided
- Leakage deduction of 0% justified only as 'deemed negligible' without quantification, in a CMM project where displaced methane or grid interactions could generate leakage
- Contradiction on whether CMM capture is legally required (earlier PDD: yes; later PDD: no), which directly affects additionality if capture is mandated
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-verified but material IRR and TDLi,y findings; capture-legality contradiction
reversal risk noted as N/A for power generation
0% deduction, 'deemed negligible' only, no quantification
Project-specific, modeled; reassessment not yet due under VCS 10-year rule
FPIC conducted, grievance mechanism present, safeguards documented
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →