Yangxiang AWMS GHG Mitigation Project in Hebei province
#659of 1084 in China#761of 1339 in Verra (VCS)#36of 105 in AMS-III.D
Audit Analysis
A VCS-registered swine-farm anaerobic digestion project in Hebei, China, with VVB-confirmed additionality and all corrective actions resolved, but undermined by extensive initial material findings (7 CARs, 7 CLs), a significant grid emission factor discrepancy between PDD versions, and unresolved leakage quantification. The ERR figures show a 12-fold gap between the PDD lifetime estimate and the validation report's confirmed figure, raising over-crediting concerns for the full crediting period.
Red Flags
- Grid emission factor changed from 0.7119 (2022 PDD) to 1.3 (2024 PDD) — a 83% increase that materially affects project emission calculations and was not explained in available documents
- PDD lifetime ERR estimate of 273,648 tCO2e versus validation report confirmed figure of 22,296 tCO2e for the monitoring period — a 12-fold gap that, while on different bases, signals potential over-crediting risk over the full 10-year crediting period
- Leakage is described as 'quantified' in the justification field but no actual deduction percentage appears in any extracted document, leaving the magnitude of leakage treatment unverifiable
- 7 Corrective Action Requests and 7 Clarifications were raised by the VVB covering calculation errors, missing parameters, incorrect IPCC factors, and spreadsheet integrity issues — all resolved but indicating weak initial MRV design
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 3,894 | 3,894 | 0 | |
| Total | 3,894 | 3,894 | 0 |
Risk Indicators
VVB-confirmed combined test
Waste-avoidance project, N/A reversal risk
Quantified but no percentage stated
Project-specific, reassessment not yet due
Grievance & benefit sharing present, FPIC not conducted
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →