VCSWaste handling and disposalChina Registry: RegisteredAMS-III.D

Yangxiang AWMS GHG Mitigation Project In Shandong Province

VCS-3872 ↗

#540of 1084 in China#631of 1339 in Verra (VCS)#21of 105 in AMS-III.D

5.2/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
5.0
Documentation
5.0

Audit Analysis

The Yangxiang AWMS project in Shandong is a registered VCS waste-methane avoidance project with VVB-confirmed additionality and consistent first-period ERR figures, but it carries moderate risk from a project-specific modeled baseline, absence of a stated buffer pool, under-delivery relative to the pro-rata PDD expectation (~70%), and a set of unresolved corrective actions from the verification report. The project is functional but not high-assurance.

Red Flags

  • PDD lifetime ERR estimate (1,190,572 tCO₂e) is roughly 8× the first-period verified figure (144,879 tCO₂e); the project delivered only ~70% of the pro-rata expectation for the 21-month monitoring window, signalling potential over-crediting in the ex-ante design.
  • No buffer pool percentage is stated in any available document, and the verification report marks non-permanence risk as 'N/A' without a quantified reversal-risk analysis, leaving permanence protection unverified.
  • Seven corrective actions were required by the VVB (Carbon Check India), including updating tool versions, completing monitoring tables, and fixing equation errors, indicating the project documentation was not fully compliant at verification.
  • Leakage is described as 'quantified' in the justification field, yet no actual deduction percentage appears in any extracted document, creating an evidentiary gap on a key integrity parameter.

Credit Vintages

IssuedRetiredAvailable
2021
39,03320,01019,023
2022
10,9675,4875,480
Total50,00025,49724,503

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

non-permanence marked N/A

Leakage

Quantified justification but no deduction % found

Baseline

Project-specific modeled baseline; no reassessment date

Safeguards

Grievance mechanism present; FPIC not stated

Double-claim

CORSIA and CCP status both unknown

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04AMS-III.D / AMS-III.F

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents