Skip to main content
VCSEnergy industries (renewable/non-renewable sources); Waste handling and disposalChina Registry: RegisteredACM0001

Yichang Sunjiawan MSW landfill site LFG recovery to power project

VCS-2354 ↗

#948of 1084 in China#1087of 1339 in Verra (VCS)#114of 159 in ACM0001

4.3/ 10
Integrity
4.5
Transparency
4.5
Claim Safety
4.5
Documentation
3.5

Audit Analysis

A VCS-registered landfill gas recovery project in China with a well-understood project type and inherent permanence advantages, but undermined by a material finding that the ER calculation was incorrect, a contradiction on whether gas capture is legally required, and numerous inconsistencies across documents. The low extraction confidence and 12 inter-document contradictions significantly erode confidence in the data record.

Red Flags

  • Material finding: the ER calculation was found to be incorrect by the VVB, with a corrective action to recalculate required (verification report, Nov 2025)
  • Contradiction on whether LFG capture is legally required: the validation report (Jan 2021) states it is, while the monitoring report (Oct 2024) states it is not — this directly affects additionality
  • Leakage justification shifted from 'quantified' (verification report, Oct 2021) to 'deemed negligible' (verification report, Dec 2022) without clear explanation
  • Low extraction confidence across the document set, with 12 contradictions identified between documents
  • Ex-post monitoring parameters found incomplete relative to methodology requirements (material finding, verification report Nov 2025)

Credit Vintages

IssuedRetiredAvailable
2019
24,772024,772
2020
43,636043,636
2021
55,94720,41435,533
2022
55,18829,72525,463
2023
64,02360,3043,719
2024
34,6803,68530,995
Total278,246114,128164,118

Risk Indicators

Additionality

Investment test VVB-confirmed, but capture-legally-required status contradicted across documents

Permanence

LFG combustion project — no storage or reversal risk; no reversal events reported

Leakage

0% deduction deemed negligible (reasonable for LFG), but justification shifted from 'quantified' to 'negligible' between reports

Baseline

Project-specific measured baseline; last reassessment date not stated; not yet due under VCS 10-year rule

Safeguards

FPIC and grievance mechanism present per most recent verification, but contradicted by earlier monitoring report

Double-claim

CORSIA eligibility and CCP status both not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04ACM0001

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents