Yichun Erduoyan Wind Power Project 28.05MW
#97of 1935 in Renewable energy#23of 1084 in China#33of 1339 in Verra (VCS)#66of 1287 in ACM0002
Audit Analysis
A 28.05 MW wind power project in China with a jurisdictional baseline, VVB-verified investment additionality test, and no permanence risk (non-AFOLU). The project delivered approximately 132% of the pro-rata ex-ante expectation for the elapsed monitoring period, indicating conservative crediting. Several corrective actions were required around meter accuracy, documentation completeness, and a Scope 3 double-claiming flag, but no fundamental integrity issues were identified.
Red Flags
- FAR-1 flags that public statements regarding Scope 3 emissions require double-claiming disclosure for future issuances, creating residual greenwashing risk
- Seven corrective actions were required, including conservative adjustment of monitored values due to a meter accuracy downgrade (0.2S to 0.5S) and missing DNA approval letters
- Grid emission factor is from 2006, which is 17 years old at the time of the 2023 verification report, raising questions about baseline currency
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2007 | 3,208 | 3,208 | 0 | |
| Total | 3,208 | 3,208 | 0 |
Risk Indicators
VVB-confirmed investment test
Not AFOLU, no reversal risk
Negligible, appropriate for wind
Jurisdictional method, 2006 grid EF
Mentioned but FPIC/grievance not detailed
CORSIA/CCP unconfirmed, FAR-1 flag
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.