Zeliha Wind Power Plant

ICR-253 ↗

#1395of 1935 in Renewable energy#27of 75 in TR#54of 154 in Intl. Carbon Registry (ICR)#1074of 1287 in ACM0002

4.6/ 10
Integrity
5.5
Transparency
4.0
Claim Safety
4.5
Documentation
3.5

Audit Analysis

The Zeliha Wind Power Plant is a wind-energy avoidance project under the ICR standard with a jurisdictional baseline and VVB-confirmed additionality, but the validation record contains 27 material findings, 22 corrective actions, and five inter-document contradictions (including a factor-of-10 discrepancy in claimed ERR and a 13% grid-emission-factor mismatch). CORSIA eligibility is confirmed while CCP status is unstated, creating a meaningful double-claiming exposure. No monitoring or verification data are available, so the project's actual performance cannot be assessed.

Red Flags

  • Claimed ERR differs by a factor of 10 between two versions of the validation report (32,870 vs 328,700 tCO2), and the relationship to the 10-year ex-ante lifetime estimate of 328,700 is unclear
  • Grid emission factor is 0.6261 tCO2/kWh in the validation report but 0.7108 in the appendix — a 13% discrepancy that directly affects the ERR calculation
  • CORSIA eligibility is confirmed while CCP status is not stated, leaving the double-claiming pathway unresolved
  • Crediting period is 7 years (2016-07-03 to 2023-07-03) in the validation report but 10 years (2016-04-07 to 2026-03-07) in the issuance document
  • 27 material findings and 22 corrective actions were raised at validation, including incomplete additionality demonstration, incomplete baseline ER calculations, and missing meter evidence

Credit Vintages

IssuedRetiredAvailable
2016
16,300016,300
2017
32,870032,870
2018
32,870032,870
2019
32,870032,870
2020
32,870032,870
2021
32,870032,870
2022
32,870032,870
2023
32,870032,870
2024
32,870032,870
2025
32,870032,870
2026
16,570016,570
Total328,7000328,700

Risk Indicators

Additionality

VVB-confirmed but test type contradictory

Permanence

Wind avoidance – no reversal risk

Leakage

Negligible – appropriate for wind

Baseline

Jurisdictional but EF contradicted

Safeguards

Grievance present, FPIC not conducted

Double-claim

CORSIA-eligible, CCP status unknown

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-08ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents