Skip to main content
VCSEnergy industries (renewable/non-renewable sources); Waste handling and disposalTurkey Registry: RegisteredACM0001

Zonguldak Landfill Gas to Electricity Project

VCS-4469 ↗

#133of 189 in Methane#270of 295 in Turkey#1089of 1339 in Verra (VCS)#115of 159 in ACM0001

4.3/ 10
Integrity
4.0
Transparency
4.5
Claim Safety
4.0
Documentation
5.0

Audit Analysis

The Zonguldak Landfill Gas to Electricity project has a verified additionality assessment and a named VVB, but the verification report surfaced 13 material findings including a 37%+ gap between estimated and actual emission reductions, an initial exclusion of project emissions, and multiple baseline and calculation inconsistencies. The 0% leakage deduction is justified only as 'deemed negligible,' which is a weak basis for a landfill gas project. Seven contradictions across documents and a low extraction confidence further erode confidence in the data underpinning the credit claims.

Red Flags

  • Actual emission reductions were 48.9% (2022) and 47.5% (2023 partial) lower than the project's own estimates, a discrepancy the VVB flagged as excessive
  • Project emissions from electricity consumption were initially excluded from the calculation and only added after a site-visit finding, indicating a material under-reporting risk in the original monitoring
  • Leakage deduction is 0% with a justification of 'deemed negligible' — a weak basis for a landfill gas project where uncollected methane is a well-known pathway
  • Baseline scenario classification is inconsistent between the PDD (Case 1) and the verification report (Case 3), and the VVB required clarification on government policy validation
  • The PDD ex-ante lifetime estimate (186,998 tCO2e) is 50% higher than the verified figure (124,559 tCO2e) reported in the verification report, raising questions about the robustness of the original estimates

Credit Vintages

IssuedRetiredAvailable
2022
74,93838,07736,861
2023
88,09638,30349,793
2024
86,352086,352
Total249,38676,380173,006

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, 'deemed negligible' — weak for landfill gas

Baseline

Project-specific, measured; last reassessment not stated

Safeguards

FPIC and grievance mechanism present but FPIC status contrad

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-31ACM0001

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents