Skip to main content
ScoredACRTransport / Fleet EfficiencyARKANSAS, USRegistry: Crediting endedGeneral Methodologyv2.1

Truck Stop Electrification, Arkansas

Developer: IdleAir

ACR-132 ↗

#696of 1716 in United States#359of 957 in American Carbon Registry (ACR)

Crediting ended

The crediting period has ended. Credits already issued exist; no new ones will be issued unless the crediting period is renewed.

American Carbon Registry: “COMPLETED”

Assessment

CarbonMeld document-based assessment

01020304 Overall 5.1 / 10 Dimension scores are locked — the faint arcs are empty tracks, not zero scores.

Scale 0–10 · method weights: integrity 35% · transparency 25% · claim safety 25% · documentation 15%.

Analysis

The IdleAir Truck Stop Electrification project (ACR-132) is a legacy ACR project with verified additionality and a permanent technology-based reduction, but its integrity is undermined by multiple material findings including credits claimed outside the crediting period, calculation errors, and missing utility data that required alternative estimation. The project-specific modeled baseline, absence of quantified leakage analysis, and lack of safeguards documentation further limit confidence. All identified errors were corrected before final verification, and the ERT ultimately found the estimates fair, accurate, and conservative.

Red Flags

5 red flags detected — Unlock with Premium

Findings

Risk Indicators

Additionality

🔒

Permanence

🔒

Leakage

🔒

Baseline

🔒

Safeguards

🔒

Double-claim

🔒

Risk indicator details are a Premium feature

Score Breakdown

Score factors per dimension are a Premium feature — Unlock with Premium

Detailed Analysis

The detailed per-dimension analysis is a Premium feature — Unlock with Premium

Evidence

Unlock the full analysis

Per-dimension scores, risk indicators, 5 red flags, score factors, detailed analysis, and 4 registry documents (4 analyzed).

€9+ VAT · 30-day pass · one-time, no auto-renewal

Every rated project, PDF reports, API access, portfolio alerts and per-dimension scores with red-flag details in side-by-side comparisons for 30 days (public-data comparison is free; fair use: 30 projects per day).

Price + VAT · By paying you accept the Terms of Use — digital content, no refunds. How Premium works

Eligibility & market

What can you claim with this credit?

Four checks buyers ask about, from the registry and the Integrity Council (ICVCM).

  • Airlines (CORSIA)

    No CORSIA label on the registry

    Not usable for airlines' CORSIA obligations.

    Source: registry label

  • Integrity label (ICVCM CCP)

    No ICVCM information

    No CCP label and no ICVCM decision found for this project's methodology.

  • Removal or reduction

    Emission reduction or avoidance

    Prevents or reduces emissions — fits contribution claims, not SBTi neutralisation.

    Source: project credit type

  • Paris Agreement (Article 6)

    No Article 6 authorization

    No corresponding adjustment: the host country can also count this reduction towards its own target.

    Source: registry label

Information only, from public sources. Claim rules (CORSIA, SBTi, EU rules on green claims) change: check them before making a public claim. Since 27 September 2026, EU consumer rules do not allow “climate neutral” product claims based on offsets.

Registry labels last checked:2026-09-27

Credit Vintages Exhausted

IssuedRetiredAvailable
2003
9589580
2004
1,3741,3740
2005
1,7131,7130
2006
3,0643,0640
2007
7,2717,2710
2008
8,6168,6160
2009
5,0735,0730
Total28,06928,0690

Where to buy

Got an offer for these credits? Check it against the registry →

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

Profile & governance

Analysis ProvenanceGeneral Methodologyv2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected] →

Contest this rating

Something wrong in the analysis, or a registry document we have not used? Send us the link to the public source: you get a reference and an answer within 30 days.

Contest this rating →