Skip to main content
CarbonMeld CarbonMeld Carbon Observatory
Tools
EN
ScoredACRCoal Mine MethaneWEST VIRGINIA, USRegistry: RegisteredGeneral Methodologyv2.1

Marshall County Flare III

Developer: NextEra Energy Marketing, LLC

ACR-610 ↗

#453of 533 in Methane#1234of 1661 in United States#662of 934 in American Carbon Registry (ACR)

Assessment

CarbonMeld document-based assessment

01020304 Overall 3.9 / 10 Dimension scores are locked — the faint arcs are empty tracks, not zero scores.

Scale 0–10 · method weights: integrity 35% · transparency 25% · claim safety 25% · documentation 15%.

Analysis

Marshall County Flare III is a coal mine methane capture project in West Virginia verified by First Environment of California, Inc., with a recent verification report (November 2025) covering the March 2024–February 2025 monitoring period. However, the documents reviewed are notably sparse: additionality testing, baseline methodology, leakage treatment, and safeguards are all absent from the available data, and the verification issued a qualified positive opinion due to a gas-analyzer calibration gap. The low extraction confidence and a single unidentifiable document type further limit confidence in the completeness of the project file.

Red Flags

4 red flags detected — Unlock with Premium

Findings

Risk Indicators

Additionality

🔒

Permanence

🔒

Leakage

🔒

Baseline

🔒

Safeguards

🔒

Double-claim

🔒

Risk indicator details are a Premium feature

Score Breakdown

Score factors per dimension are a Premium feature — Unlock with Premium

Detailed Analysis

The detailed per-dimension analysis is a Premium feature — Unlock with Premium

Evidence

Unlock the full analysis

Per-dimension scores, risk indicators, 4 red flags, score factors, detailed analysis, and 11 registry documents (11 analyzed).

€9+ VAT · 30-day pass · one-time, no auto-renewal

Every rated project, PDF reports, API access, portfolio alerts and per-dimension scores with red-flag details in side-by-side comparisons for 30 days (public-data comparison is free; fair use: 30 projects per day).

Price + VAT · By paying you accept the Terms of Use — digital content, no refunds. How Premium works

Eligibility & market

What can you claim with this credit?

Four checks buyers ask about, from the registry and the Integrity Council (ICVCM).

  • Airlines (CORSIA)

    No CORSIA label on the registry

    Not usable for airlines' CORSIA obligations.

    Source: registry label

  • Integrity label (ICVCM CCP)

    Methodology under ICVCM assessmentACR Capturing and Destroying Methane from Coal

    The Integrity Council has not decided on this methodology yet.

    Source: ICVCM assessment

  • Removal or reduction

    Emission reduction or avoidance

    Prevents or reduces emissions — fits contribution claims, not SBTi neutralisation.

    Source: project sector

  • Paris Agreement (Article 6)

    No Article 6 authorization

    No corresponding adjustment: the host country can also count this reduction towards its own target.

    Source: registry label

Information only, from public sources. Claim rules (CORSIA, SBTi, EU rules on green claims) change: check them before making a public claim. Since 27 September 2026, EU consumer rules do not allow “climate neutral” product claims based on offsets.

Registry labels last checked:2026-09-27

Credit Vintages Exhausted

IssuedRetiredAvailable
2021
18,45000
2022
29,60400
2023
31,28800
2024
30,70300
2025
26,57100
2026
24,42200
Total161,03800

Where to buy

Got an offer for these credits? Check it against the registry →

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

Profile & governance

Analysis ProvenanceGeneral Methodologyv2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected] →

Contest this rating

Something wrong in the analysis, or a registry document we have not used? Send us the link to the public source: you get a reference and an answer within 30 days.

Contest this rating →