Skip to main content
CarbonMeld CarbonMeld Carbon Observatory
Tools
EN
Re-assessment pendingBCRFuel substitutionEcuadorRegistry: In developmentAMS-III.C

EV TOKEN VERDE

Developer: EV TOKEN S.A.S

BCR-EC-717-7-001 ↗

Score from methodology v2.1 (analysis of 26 Sep 2026). Re-assessment under v2.2 pending.

In development

Listed in the registry's pipeline: the project, or its new phase, has not been independently validated or registered yet. Whether credits were issued in the past is shown by the vintages below.

Any offer to sell its credits is a forward commitment on possible future issuance, not an existing carbon credit. Verify on the registry before paying.

BioCarbon Registry: “Listed”

Assessment

CarbonMeld document-based assessment

01020304 Overall 4.6 / 10 Dimension scores are locked — the faint arcs are empty tracks, not zero scores.

Scale 0–10 · method weights: integrity 35% · transparency 25% · claim safety 25% · documentation 15%.

Re-assessment pending · v2.1

Analysis

EV Token Verde is a newly listed fuel-substitution project (electric vehicles replacing fossil-fuel vehicles in Ecuador) with a reasonable 10% quantified leakage deduction and a combined additionality test, but the available record contains only the PDD with no VVB verification report, no named VVB, and no usage-monitoring methodology. The project is an avoidance instrument with no carbon-stock reversal risk, and no material findings or contradictions were identified, yet the absence of independent verification details and monitoring parameters limits confidence in the 495,408 tCO₂e lifetime claim.

Red Flags

3 red flags detected — Unlock with Premium

Findings

Risk Indicators

Additionality

🔒

Permanence

🔒

Leakage

🔒

Baseline

🔒

Safeguards

🔒

Double-claim

🔒

Risk indicator details are a Premium feature

Score Breakdown

Score factors per dimension are a Premium feature — Unlock with Premium

Detailed Analysis

The detailed per-dimension analysis is a Premium feature — Unlock with Premium

Evidence

Unlock the full analysis

Per-dimension scores, risk indicators, 3 red flags, score factors, detailed analysis, and 1 registry document (1 analyzed).

€9+ VAT · 30-day pass · one-time, no auto-renewal

Every rated project, PDF reports, API access, portfolio alerts and per-dimension scores with red-flag details in side-by-side comparisons for 30 days (public-data comparison is free; fair use: 30 projects per day).

Price + VAT · By paying you accept the Terms of Use — digital content, no refunds. How Premium works

Eligibility & market

What can you claim with this credit?

Four checks buyers ask about, from the registry and the Integrity Council (ICVCM).

  • Airlines (CORSIA)

    Not published

    This registry does not publish CORSIA eligibility per project.

  • Integrity label (ICVCM CCP)

    No ICVCM information

    No CCP label and no ICVCM decision found for this project's methodology.

  • Removal or reduction

    Emission reduction or avoidance

    Prevents or reduces emissions — fits contribution claims, not SBTi neutralisation.

    Source: methodology

  • Paris Agreement (Article 6)

    Not published

    This registry does not publish Article 6 authorizations.

Information only, from public sources. Claim rules (CORSIA, SBTi, EU rules on green claims) change: check them before making a public claim. Since 27 September 2026, EU consumer rules do not allow “climate neutral” product claims based on offsets.

Credit Vintages

Issuance data not yet available — check back soon.

Where to buy

Got an offer for these credits? Check it against the registry →

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

Profile & governance

Analysis ProvenanceAMS-III.C

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected] →

Contest this rating

Something wrong in the analysis, or a registry document we have not used? Send us the link to the public source: you get a reference and an answer within 30 days.

Contest this rating →