Skip to main content
ScoredGCCAzerbaijanRegistry: RegisteredAMS-I.D

SOCAR-1 Hydro Bundle

Developer: SOCAR Trading SA

GCC-1208 ↗

#177of 232 in Global Carbon Council (GCC)#783of 1564 in AMS-I.D

Assessment

CarbonMeld document-based assessment

01020304 Overall 5.3 / 10 Dimension scores are locked — the faint arcs are empty tracks, not zero scores.

Scale 0–10 · method weights: integrity 35% · transparency 25% · claim safety 25% · documentation 15%.

Analysis

The SOCAR-1 Hydro Bundle is a grid-connected renewable hydro project in Azerbaijan with a solid VVB-verified investment additionality test and a jurisdictional baseline, but it carries a material finding on CORSIA double counting, a weak leakage justification, and no FPIC. The project is newly registered with its crediting period starting in 2026, so the absence of monitoring data is expected, yet several documentation gaps and an open corrective action on the Host Country Letter of Authorization leave residual risk on claim integrity.

Red Flags

4 red flags detected — Unlock with Premium

Findings

Risk Indicators

Additionality

🔒

Permanence

🔒

Leakage

🔒

Baseline

🔒

Safeguards

🔒

Double-claim

🔒

Risk indicator details are a Premium feature

Score Breakdown

Score factors per dimension are a Premium feature — Unlock with Premium

Detailed Analysis

The detailed per-dimension analysis is a Premium feature — Unlock with Premium

Evidence

Eligibility & market

What can you claim with this credit?

Four checks buyers ask about, from the registry and the Integrity Council (ICVCM).

  • Airlines (CORSIA)

    In scope, not yet eligible

    The registry flags units as in scope for CORSIA; eligibility still needs host-country authorization.

    Source: registry label

  • Integrity label (ICVCM CCP)

    No ICVCM information

    No CCP label and no ICVCM decision found for this project's methodology.

  • Removal or reduction

    Emission reduction or avoidance

    Prevents or reduces emissions — fits contribution claims, not SBTi neutralisation.

    Source: methodology

  • Paris Agreement (Article 6)

    Not published

    This registry does not publish Article 6 authorizations.

Information only, from public sources. Claim rules (CORSIA, SBTi, EU rules on green claims) change: check them before making a public claim. Since 27 September 2026, EU consumer rules do not allow “climate neutral” product claims based on offsets.

Registry labels last checked:2026-09-27

Credit Vintages

Issuance data not yet available — check back soon.

Where to buy

Got an offer for these credits? Check it against the registry →

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

Profile & governance

Analysis ProvenanceAMS-I.D.: Grid connected renewable electricity generation

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected] →

Contest this rating

Something wrong in the analysis, or a registry document we have not used? Send us the link to the public source: you get a reference and an answer within 30 days.

Contest this rating →