Sinenergy Solar Power Project
Developer: Super Carbon X Company Limited
#2166of 5089 in Renewable energy#108of 237 in Vietnam#157of 264 in Global Carbon Council (GCC)#1576of 3484 in ACM0002
Score from methodology v2.1 (analysis of 26 Sep 2026). Re-assessment under v2.2 pending.
Assessment
Scale 0–10 · method weights: integrity 35% · transparency 25% · claim safety 25% · documentation 15%.
Findings
Risk Indicators
🔒
🔒
🔒
🔒
🔒
🔒
Score Breakdown
Score factors per dimension are a Premium feature — Unlock with Premium
Gates applied
The gates applied to this score are a Premium feature — Unlock with Premium
Detailed Analysis
The detailed per-dimension analysis is a Premium feature — Unlock with Premium
Evidence
Eligibility & market
What can you claim with this credit?
Four checks buyers ask about, from the registry and the Integrity Council (ICVCM).
Airlines (CORSIA)
Pilot phase only (2021–2023)
Eligible only for the pilot phase: not usable for the current 2024–2026 phase.
Source: registry label · read on 1 Nov 2026
Covers: credits of this project that carry the label on the registry — not every unit or lot
Integrity label (ICVCM CCP)
No ICVCM information
No CCP label and no ICVCM decision found for this project's methodology.
Removal or reduction
Emission reduction or avoidance
Prevents or reduces emissions — fits contribution claims, not SBTi neutralisation.
Source: project sector
Covers: the project type, not a label on individual credits
Paris Agreement (Article 6)
Not published
This registry does not publish Article 6 authorizations.
Information only, from public sources. Claim rules (CORSIA, SBTi, EU rules on green claims) change: check them before making a public claim. Since 27 September 2026, EU consumer rules do not allow “climate neutral” product claims based on offsets.
Registry labels last checked:2026-11-01
Credit Vintages
Issuance data not yet available — check back soon.
Methodology versions used
The methodology version stated in each monitoring, verification and issuance document, by period, compared with the official methodology pages.
Period not statedACM0002the documents for this period state different versions (v20.0, v21.0)
monitoring report + verification report
- ACM0002: Active (CDM / UNFCCC) · official page · verified on
A version is shown only when the document's own text writes it next to the methodology code. Current versions, status and CCP ranges come from the official pages linked, checked on the date shown.
Where to buy
Got an offer for these credits? Check it against the registry →
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
Profile & governance
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Contest this rating
Something wrong in the analysis, or a registry document we have not used? Send us the link to the public source: you get a reference and an answer within 30 days.
Contest this rating →Similar projects
Same methodology or sector, the same registry first.
- Wind Power Projects by AESGCC-711
- Serra do Mel I and II Renewable Energy ProjectGCC-1118
- 60 MW Wind Power ProjectGCC-480
- Renewable Solar Power Project by Tata Power in Karnataka & Rajasthan.GCC-1225
- UAE Wind Program – Phase 1GCC-519
- Dingbian Xin’an bian 50MW Wind Power ProjectGCC-246
- Vivoratá Wind Farm ProjectGCC-1117
- Van Giao Solar Power 1 and Van Giao Solar Power 2GCC-783
