Skip to main content
Database · Buyer

Carbon credit buyers/

Webshop

Named as beneficiary of 9,561 t CO₂e retired in 25 retirements from 9 projects · 2016-09 → 2019-12

Source: the public retirement records of VCS (beneficiary named by the registry). A retirement beneficiary is not necessarily the direct purchaser of the credits, and only retirements where the registry publishes the beneficiary are counted, so the total can be lower than what the organisation retired. The quality view below is CarbonMeld's assessment of each project — not a rating of the company.

Wrong name, or a retirement attributed to the wrong organisation? Report a profile correction.

What these tonnes are

  • Projects currently rated 7+/100%
  • Projects currently rated below 5/108%
  • Projects without a current rating92%
  • Projects with a registry red flag (rejected, withdrawn…)28%
  • Projects carrying the registry's CCP label0%
  • Carbon removal projects8%
  • Projects carrying a CORSIA eligibility label0%

Shares weight each project by the tonnes this organisation retired from it: the denominator is all retired tonnes and the categories overlap — a project can carry several labels at once. They use today's registry labels and CarbonMeld assessments of the projects, not the vintage-specific certification of the retired units, and not those at the time of retirement. The unassessed share is not a quality verdict: it names projects without a current CarbonMeld assessment.

Projects retired

  1. KARIBA REDD+ PROJECTVCS-902ZimbabweWithdrawn from the registry2,646 t
    analysis queued
  2. analysis queued
  3. score withdrawn
  4. score withdrawn
  5. analysis queued
  6. 4.1/10
  7. analysis queued
  8. Siam Cement Biomass ProjectVCS-403Thailand1 t
    analysis queued
  9. score withdrawn

Latest retirements

DateTonnesVintageProject
2019-12-218462016KARIBA REDD+ PROJECT
2019-12-212642013Restoration of degraded areas and reforestation in Cáceres and Cravo Norte, Colombia
2019-12-211982011Restoration of degraded areas and reforestation in Cáceres and Cravo Norte, Colombia
2019-12-211022011Restoration of degraded areas and reforestation in Cáceres and Cravo Norte, Colombia
2019-12-21932013Restoration of degraded areas and reforestation in Cáceres and Cravo Norte, Colombia
2019-12-2112013Restoration of degraded areas and reforestation in Cáceres and Cravo Norte, Colombia
2019-12-171,6932006Grouped Hydropower Plants in Chongqing, Yunnan,Sichuan and Guizhou Provinces, P.R. China
2019-12-175732013KARIBA REDD+ PROJECT
2019-12-1722010Mobuya Mini Hydro Power Plant 3 x 1000 kW North Sulawesi, Indonesia
2019-12-1712007 - 2010INFAPRO Rehabilitation of logged-over dipterocarp forest in Sabah, Malaysia
2019-12-161,4212010Wastewater Treatment with Biogas Production (UASB) and Heat Utilization at General Starch Co Ltd.
2019-12-168562012Lacandon – Forest for life REDD+ Project
2019-12-162762013Capacity Upgrade of Gunung Salak Geothermal Power Plant Project, Indonesia
2018-12-248442010Mobuya Mini Hydro Power Plant 3 x 1000 kW North Sulawesi, Indonesia
2018-12-247272010Wastewater Treatment with Biogas Production (UASB) and Heat Utilization at General Starch Co Ltd.
2018-12-242222013Capacity Upgrade of Gunung Salak Geothermal Power Plant Project, Indonesia
2018-12-24422006Grouped Hydropower Plants in Chongqing, Yunnan,Sichuan and Guizhou Provinces, P.R. China
2018-12-2412011Siam Cement Biomass Project
2018-12-2412011Capacity Upgrade of Gunung Salak Geothermal Power Plant Project, Indonesia
2017-12-15712012Restoration of degraded areas and reforestation in Cáceres and Cravo Norte, Colombia
2017-12-1512012Restoration of degraded areas and reforestation in Cáceres and Cravo Norte, Colombia
2017-12-083042013KARIBA REDD+ PROJECT
2017-12-07992012Lacandon – Forest for life REDD+ Project
2016-09-299052012KARIBA REDD+ PROJECT
2016-09-29182011KARIBA REDD+ PROJECT