Skip to main content
UCRKadi Mehsana - IndiaAMS-I.D

1.00 MW CERA Solar Project in Mehsana, Gujarat

UCR-22 ↗

#450of 770 in Renewable energy#12of 421 in Universal Carbon Registry (UCR)#160of 416 in AMS-I.D

4.2/ 10
Integrity
4.5
Transparency
3.5
Claim Safety
5.0
Documentation
3.0

Audit Analysis

A 1 MW solar PV project in Gujarat registered under the UCR registry using the AMS-I.D methodology with a jurisdictional baseline. The PDD presents a coherent design with a grid emission factor of 0.93463 tCO₂/MWh and smart-meter monitoring, but the absence of any verification report, monitoring report, or VVB confirmation in the available record leaves additionality, actual performance, and permanence unverified. The project is low-risk in nature (solar PV, no inherent reversal risk) but the documentation gap significantly limits confidence in the claims.

Red Flags

  • No verification report or VVB confirmation found in the available record — additionality test type and VVB verification are not documented
  • No ERR figures (claimed or verified) available to assess over- or under-crediting
  • Only a single document (PDD) is available; no monitoring report or verification report to confirm actual performance over the 2014–2021 crediting period

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Test not documented in available record

Permanence

Solar PV — no inherent reversal risk

Leakage

0% deemed negligible — appropriate for grid-connected PV

Baseline

Jurisdictional baseline; reassessment date not stated

Safeguards

Mentioned and benefit-sharing described; FPIC and grievance

Double-claim

CORSIA and CCP status not stated in available record

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents