1.2 MW Biomass Gasification Power Generation Project in Vadodara District of Gujarat, India
#168of 352 in Biomass#748of 975 in India#1124of 1459 in CDM (UNFCCC)#452of 806 in AMS-I.D
Audit Analysis
A 1.2 MW biomass gasification CDM project in Gujarat, India, with a VVB-confirmed investment additionality test and a reasonable grid emission factor, but significant gaps in monitoring data, permanence mechanisms, and baseline robustness. The project-specific baseline and 0% leakage deduction, combined with the complete absence of verified monitoring results, limit confidence in the claimed 62,565 tCO₂e over the 10-year crediting period.
Red Flags
- No monitoring reports or verified ERR figures found in any available document — the 62,565 tCO₂e claim is entirely unverified
- Contradiction between the PDD (jurisdictional baseline) and the validation report (project-specific baseline) on baseline method
- 12 Corrective Action Requests were raised during validation, indicating substantial initial documentation deficiencies (all subsequently closed)
- Low extraction confidence across the document set, suggesting key data may be missing or unreadable
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
no reversal data
0% deduction, 'deemed negligible' — thin justification
Project-specific baseline; PDD/VVB contradiction
Safeguards and benefit sharing mentioned; no FPIC or grievance mechanism
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →