Skip to main content
CDMWindIndiaAMS-I.D

1.2 MW Wind Power Project in Tamil Nadu by RCR-Eco Power

CDM-5201 ↗

#1399of 1935 in Renewable energy#749of 975 in India#1125of 1459 in CDM (UNFCCC)#453of 806 in AMS-I.D

4.5/ 10
Integrity
5.5
Transparency
3.5
Claim Safety
4.5
Documentation
3.5

Audit Analysis

A small 1.2 MW CDM wind project in Tamil Nadu with a confirmed investment-test additionality and a standard jurisdictional grid baseline, but undermined by five material findings from the VVB, a ten-fold discrepancy in the claimed emission reduction figure between the validation report and an appendix, and a near-total absence of monitoring or verification data. The low extraction confidence and missing monitoring records further erode confidence in the project's data integrity.

Red Flags

  • Ten-fold discrepancy in total ERR: the validation report states 26,470 tCO₂ while an appendix figure reads approximately 2,647 tCO₂ — a 10× gap that raises serious over-crediting or data-entry concerns
  • Five material findings (CARs) raised by RINA Services, including lack of transparency on electricity export to the Southern grid, unjustified benchmark selection, and absence of a meter cross-checking procedure in the monitoring plan
  • No monitoring report, verified ERR, or monitoring period data found in any available document despite a 10-year crediting period (2011–2021)
  • Low extraction confidence across the document set, indicating at least one key document was poorly readable or incomplete

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Wind avoidance – no reversal risk

Leakage

0% deemed negligible – reasonable for on-grid wind

Baseline

Jurisdictional grid EF (0.945 tCO₂/MWh, 2009)

Safeguards

Safeguards mentioned; FPIC and grievance mechanism not documented

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-01AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents