1.5 MW Grid connected Wind Electricity Generation at Tirunelveli District, Tamilnadu, India by Kallam Agro Products and Oils Private Limited
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB, and the validation report says a combined additionality test was used.
missing Leakage is not addressed in the validation report, and reversal events are not addressed.
Transparency
verified The project has a named VVB, Bureau Veritas Certification, and a defined monitoring period in the validation record.
missing No verified or claimed emission reduction totals are available in the extracted record, and key MRV details such as grid factor and usage monitoring are not stated.
Claim Safety
verified The project is a wind electricity project under CDM, which generally reduces some baseline and leakage complexity compared with land-use projects.
missing The baseline is project-specific rather than standardized, leakage is left unjustified, and there is no evidence of CCP status or CORSIA ineligibility to reduce dual-claim risk.
Documentation
verified Multiple official documents were used, including a validation report and PDD, and the extraction confidence is medium rather than low.
missing The validation report lists 22 corrective action requests, and the record contains a date contradiction on the crediting period.
Detailed Analysis
Integrity
The validation report from Bureau Veritas Certification confirms additionality through a combined test, which supports the project’s core eligibility. However, the same report leaves leakage justification not addressed and does not address reversal events, while the project uses a project baseline and was subject to 22 corrective action requests and 7 clarification requests, which weakens confidence in the robustness of the crediting logic.
Transparency
The record identifies the VVB and provides a monitoring period, but several key MRV fields are missing from the extracted documents, including verified emission reduction totals, grid emission factor, and usage monitoring details. The documentation is therefore only partially transparent, with important quantitative elements not found in the available record.
Claim Safety
Claim safety is limited by the project-specific baseline and the absence of a clear leakage rationale in the validation report. The project is a wind CDM activity, which is generally lower risk than many land-use projects, but there is no evidence in the extracted record that it is excluded from CORSIA or CCP pathways, so dual-claim risk cannot be discounted.
Documentation
The evidence base includes multiple official documents, but the extracted record shows only medium extraction confidence and a large number of corrective actions in validation. The crediting period also conflicts across documents, and the later PDD date appears to differ from the validation report, so the documentation is incomplete and somewhat inconsistent.
Overall
I privileged the validation report for additionality, leakage, and reversal-related judgments because it is the named VVB document and the most direct validation source, while noting that the PDD later suggests a different additionality framing and a different crediting period. The contradiction on additionality test type was resolved in favor of the validation report’s combined test because it is the VVB-validated source; the crediting-period mismatch was treated as a reliability issue and reduced the documentation and transparency confidence. The contradiction on leakage justification was also resolved in favor of the validation report’s more conservative position, since the PDD’s deemed-negligible statement is not enough to override the validation record’s lack of treatment.
Audit Analysis
This is a CDM wind project with VVB-confirmed additionality, but the record shows substantial validation effort and several evidence gaps. Leakage treatment is weakly documented, reversal risk is not addressed, and the project relies on a project baseline rather than a more robust standardized baseline, which limits confidence in the crediting claim.
Project Description
Status: Registered Type: PA Methodology: AMS-I.D. Project type: Wind Sub-type: Wind Region: Asia & Pacific Sub-region: Southern Asia Reductions 1st period: 3.796 ktCO2e/yr
Red Flags
- The validation report recorded 22 corrective action requests and 7 clarification requests, indicating significant issues during validation.
- Leakage justification is not addressed in the validation report, and reversal risk is also not addressed.
- There is a contradiction on the crediting period between documents, and the later PDD appears to use a different start and end date.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2014 | 6,046 | 0 | 6,046 | |
| Total | 6,046 | 0 | 6,046 |
Cosa migliorerebbe questo punteggio
- Provide the full validation and monitoring evidence for emission reductions, grid factor, and leakage treatment, including the basis for any zero leakage deduction.
- Resolve the crediting-period inconsistency and publish a clear statement on reversal risk, registry status, and whether the project is eligible for or excluded from other crediting channels.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed additionality
No reversal treatment stated
0% deduction without justification
Project baseline, reassessment dated 2006
FPIC and grievance mechanism present
CORSIA/CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →