6.0/ 10
Integrity
7.0
Transparency
4.5
Claim Safety
6.0
Documentation
6.5

Audit Analysis

A 1.5 MW captive wind project in Gujarat, India, registered under CDM with a standard grid-emission-factor baseline and VVB-confirmed investment additionality. The project is technically sound with all corrective actions closed, but the absence of a verified ERR figure and a ten-fold discrepancy in claimed emissions reductions across documents create meaningful transparency and claim-safety concerns.

Red Flags

  • A ten-fold discrepancy in the claimed emissions reduction figure (29,770 tCO2e in the PDD vs. 2,977 tCO2e in an unidentified document) undermines confidence in the credit quantity.
  • No verified ERR figure was found in any available document, leaving the actual delivered reductions unconfirmed.
  • The grid emission factor is fixed at the 2012 value (0.9534 tCO2/MWh) with no evidence of periodic updating, which may overstate reductions if the grid has decarbonised since.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project, no reversal risk

Leakage

0% deemed negligible, justified

Baseline

Jurisdictional grid EF, fixed at 2012 value

Safeguards

Safeguards mentioned, FPIC not documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-01AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents