1.5 MW Wind Power Project in Rajasthan by Jivraj Tea Limited

CDM-9586 ↗

#99of 1935 in Renewable energy#50of 975 in India#56of 1459 in CDM (UNFCCC)#36of 806 in AMS-I.D

6.6/ 10
Integrity
7.0
Transparency
5.5
Claim Safety
7.0
Documentation
7.0

Audit Analysis

A straightforward 1.5 MW wind project in Rajasthan using the standard AMS-I.D. methodology, with VVB-confirmed additionality via an investment test and a jurisdictional grid-emission-factor baseline. The project presents low greenwashing risk, but transparency is limited by the absence of a verified ERR figure and several unreported eligibility and monitoring details. Four cross-document contradictions were identified and are largely explainable by differences in reporting basis and timing.

Red Flags

  • Verified ERR figure is not available in the extracted record; only the claimed 17,323 tCO2 from the monitoring report is present, limiting independent cross-checking.
  • Baseline method is described as 'jurisdictional' in the 2022 monitoring report but as 'project' in the 2014 validation report, creating ambiguity about the exact baseline construction.
  • Fourteen material findings (CARs/CLs) were raised during validation, including gaps in additionality evidence, monitoring plan detail, and stakeholder consultation, although all were subsequently resolved.

Credit Vintages

IssuedRetiredAvailable
2023
17,266017,266
Total17,266017,266

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project, no reversal events

Leakage

0% with negligible justification, appropriate for wind

Baseline

Jurisdictional grid EF, but method label contradicts across docs

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance mechanism not stated

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-01AMS-I.D.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents