1.5 MW Wind Power Project in Rajasthan
#196of 1935 in Renewable energy#97of 975 in India#115of 1459 in CDM (UNFCCC)#69of 806 in AMS-I.D
Audit Analysis
A 1.5 MW CDM wind project in Rajasthan with a jurisdictional baseline and VVB-confirmed investment additionality test. The project delivered roughly 64% of its pro-rata ex-ante expectation over the monitoring period, indicating conservative crediting. However, 11 material findings during validation (including a windmill capacity mismatch and debundling gaps) and a fixed 2009 grid emission factor introduce moderate uncertainty.
Red Flags
- Eleven material findings during validation, including a windmill capacity mismatch between the PDD and site documents, failure to demonstrate debundling criteria per Annex 13, and required corrections to investment analysis parameters (benchmark, cost, PLF)
- Grid emission factor fixed at the 2009 value of 0.9224 tCO₂/MWh for the entire 2012–2022 crediting period, with no evidence of periodic update as India's grid mix evolved
- Contradiction between the monitoring report (leakage 'deemed negligible', 0% deduction) and an appendix describing leakage as 'quantified' — the basis for the 0% deduction is ambiguous
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 15,869 | 0 | 15,869 | |
| Total | 15,869 | 0 | 15,869 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0% deemed negligible; appendix contradiction
Jurisdictional but grid EF fixed at 2009 value
Safeguards and benefit sharing mentioned; FPIC and grievance mechanism not stated
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →