A 1.5 MW CDM wind project in Rajasthan with a jurisdictional baseline and VVB-confirmed investment additionality test. The project delivered roughly 64% of its pro-rata ex-ante expectation over the monitoring period, indicating conservative crediting. However, 11 material findings during validation (including a windmill capacity mismatch and debundling gaps) and a fixed 2009 grid emission factor introduce moderate uncertainty.

Red Flags

  • Eleven material findings during validation, including a windmill capacity mismatch between the PDD and site documents, failure to demonstrate debundling criteria per Annex 13, and required corrections to investment analysis parameters (benchmark, cost, PLF)
  • Grid emission factor fixed at the 2009 value of 0.9224 tCO₂/MWh for the entire 2012–2022 crediting period, with no evidence of periodic update as India's grid mix evolved
  • Contradiction between the monitoring report (leakage 'deemed negligible', 0% deduction) and an appendix describing leakage as 'quantified' — the basis for the 0% deduction is ambiguous

Credit Vintages

IssuedRetiredAvailable
2023
15,869015,869
Total15,869015,869

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project, no reversal risk

Leakage

0% deemed negligible; appendix contradiction

Baseline

Jurisdictional but grid EF fixed at 2009 value

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance mechanism not stated

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-01AMS-I.D.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents