1.5 MW Wind Power Project in Sinnar, Maharashtra
#463of 1935 in Renewable energy#235of 975 in India#298of 1459 in CDM (UNFCCC)
Audit Analysis
A 1.5 MW CDM wind project in Maharashtra with a solid investment-test additionality assessment verified by Germanischer Lloyd and a standard jurisdictional grid baseline. The project carries no inherent permanence risk (avoidance-type) and a reasonable leakage treatment, but the extracted record lacks any monitoring-period data, verified emission reductions, or CORSIA/CCP eligibility information, and the overall extraction confidence is low.
Red Flags
- No monitoring period or verified emission-reduction figure is present in the extracted record, making it impossible to confirm actual delivery against the 29,800 tCO₂e claim.
- Minimum extraction confidence is rated low, meaning at least one key document was poorly readable and some facts may be missing or misread.
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel or market-eligibility risk unassessed.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Investment test VVB-confirmed
Avoidance-type, no reversal risk
Deemed negligible, justified
Jurisdictional grid EF, standard
Mentioned but FPIC/grievance not detailed
CORSIA/CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →