Skip to main content
CDMWindIndiaAMS-I.D

1.50 MW Wind Power Project by JC Retail India Pvt. Ltd. Pune Maharashtra, India

CDM-5370 ↗

#331of 1935 in Renewable energy#174of 975 in India#207of 1459 in CDM (UNFCCC)#121of 806 in AMS-I.D

6.0/ 10
Integrity
6.5
Transparency
5.5
Claim Safety
6.5
Documentation
5.0

Audit Analysis

A 1.5 MW wind power project in Maharashtra, India, with a verified investment-test additionality and jurisdictional baseline, delivering approximately 78% of its pro-rata ex-ante expectation (conservative). The project's main weaknesses are a large number of validation corrective actions (28 CARs), a missing verified ERR figure, and several key parameters left unstated in the available record.

Red Flags

  • 28 corrective actions were required during validation, including corrections to investment-analysis parameters (PLF, tariff, O&M escalation) and monitoring-plan gaps, indicating the initial PDD was significantly deficient
  • Verified ERR figure is not found in the available documents; only the claimed figure of 16,296 tCO2 from the monitoring report is available
  • Grid emission factor is from 2009 (0.9225 tCO2/MWh) with no evidence of periodic updating across the 10-year crediting period
  • Multiple key parameters (FNRB method, usage monitoring method, CORSIA eligibility, CCP status) are not stated in the extracted record

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project, no reversal risk

Leakage

0% deemed negligible, reasonable for wind

Baseline

Jurisdictional grid EF (2009)

Safeguards

Mentioned but FPIC and grievance mechanism unstated

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-01AMS-I.D.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents