1.50 MW Wind Power Project by JC Retail India Pvt. Ltd. Pune Maharashtra, India
#331of 1935 in Renewable energy#174of 975 in India#207of 1459 in CDM (UNFCCC)#121of 806 in AMS-I.D
Audit Analysis
A 1.5 MW wind power project in Maharashtra, India, with a verified investment-test additionality and jurisdictional baseline, delivering approximately 78% of its pro-rata ex-ante expectation (conservative). The project's main weaknesses are a large number of validation corrective actions (28 CARs), a missing verified ERR figure, and several key parameters left unstated in the available record.
Red Flags
- 28 corrective actions were required during validation, including corrections to investment-analysis parameters (PLF, tariff, O&M escalation) and monitoring-plan gaps, indicating the initial PDD was significantly deficient
- Verified ERR figure is not found in the available documents; only the claimed figure of 16,296 tCO2 from the monitoring report is available
- Grid emission factor is from 2009 (0.9225 tCO2/MWh) with no evidence of periodic updating across the 10-year crediting period
- Multiple key parameters (FNRB method, usage monitoring method, CORSIA eligibility, CCP status) are not stated in the extracted record
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0% deemed negligible, reasonable for wind
Jurisdictional grid EF (2009)
Mentioned but FPIC and grievance mechanism unstated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →