1.6 MW Wind Power CDM Project by Protectron Electromech Pvt. Ltd
#81of 1935 in Renewable energy#42of 975 in India#44of 1459 in CDM (UNFCCC)#26of 806 in AMS-I.D
Audit Analysis
A straightforward 1.6 MW onshore wind project in India displacing grid electricity, with a VVB-confirmed investment additionality test, a jurisdictional grid-emission-factor baseline, and no material findings or corrective actions. The main weaknesses are gaps in MRV detail (no verified ERR figure, no FNRB or usage-monitoring method stated) and the absence of explicit safeguards documentation (FPIC, grievance mechanism). Overall a low-risk avoidance project with solid core design but incomplete reporting.
Red Flags
- Verified ERR figure is not stated in the extracted record; only the claimed 9,692 tCO2 from the monitoring report is available, preventing an independent over/under-delivery check.
- FPIC and grievance mechanism are not documented in the available records, leaving safeguards compliance partially unverified.
- CORSIA eligibility and CCP status are not stated, so dual-channel or double-claiming risk cannot be fully excluded.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal events
0% deemed negligible, consistent with wind
Jurisdictional grid EF, standard methodology
Mentioned but FPIC/grievance not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →