1.65 MW wind energy project by M/s. Dollar Apparels
#56of 1935 in Renewable energy#32of 975 in India#35of 1459 in CDM (UNFCCC)#18of 806 in AMS-I.D
Audit Analysis
A 1.65 MW CDM wind project in India with a solid jurisdictional grid baseline and VVB-confirmed investment additionality. The project delivered roughly 81% of its pro-rata ex-ante expectation for the elapsed monitoring period, indicating conservative crediting. Minor concerns include a leakage-justification inconsistency between documents and the absence of verified ERR figures in the extracted record.
Red Flags
- Leakage justification is inconsistent: the monitoring report (2023) states leakage is 'deemed negligible' while an appendix describes it as 'quantified' — the 0% deduction is defensible for grid-displacement wind, but the documentation inconsistency weakens the record.
- The monitoring period (ending 2020-12-31) does not cover the full crediting period (ending 2022-08-19), leaving approximately 1.7 years of the crediting window without a corresponding monitoring report in the extracted record.
- Total ERR verified is not stated in the extracted record; only the claimed figure of 25,026 tCO2e from the monitoring report is available, limiting independent cross-checking.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0% deduction, justification inconsistent across docs
Jurisdictional grid baseline, standard CDM
Safeguards and benefit sharing mentioned; FPIC and grievance mechanism not stated
CORSIA and CCP status not stated in record
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →