10.2MW Yangdun Small-Scale Hydropower Project
#1061of 1935 in Renewable energy#602of 1084 in China#791of 1459 in CDM (UNFCCC)#342of 806 in AMS-I.D
Audit Analysis
A 10.2 MW small-scale hydropower project in China under CDM with a 7-year crediting period. The project is a generation-type credit with inherently low permanence risk, but the available documentation contains four contradictions between the validation and monitoring reports (baseline method, leakage justification, ERR figures, and crediting start date), and the additionality test type is not stated in the extracted record. Only one monitoring period (6.5 months) is documented for the full crediting period, limiting the ability to verify long-term performance.
Red Flags
- Additionality test type is not stated in any available document; the VVB (CEC) is identified but the specific test applied (investment, barrier, or regulatory) cannot be confirmed from the extracted record.
- Baseline method is contradictory: the validation report (2015) describes a jurisdictional baseline while the monitoring report (2016) describes a project-specific baseline, creating uncertainty about which baseline underpins the credit.
- Leakage justification is inconsistent: the validation report deems leakage negligible while the monitoring report states it was quantified, yet the deduction is 0% in both cases.
- Only one monitoring period (Sep 2015 – Mar 2016) is documented for a crediting period extending to July 2022, leaving roughly 6 years of the crediting period without verified monitoring data in the extracted record.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 17,544 | 0 | 17,544 | |
| 2012 | 38,187 | 0 | 38,187 | |
| 2013 | 39,999 | 0 | 39,999 | |
| 2016 | 101,128 | 0 | 101,128 | |
| Total | 196,858 | 0 | 196,858 |
Risk Indicators
Test type not stated in available documents
Generation project, no reversal risk
0% deduction, inconsistent justification language
Method contradictory between documents
Safeguards and benefit sharing mentioned; FPIC and grievance mechanism not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →