Skip to main content
CDMHydroIndiaAMS-I.D

10 MW Bhavani Barrage-2 Small Hydroelectric Project for a Grid connected system, Tamil Nadu, India

CDM-2807 ↗

#1448of 1935 in Renewable energy#792of 975 in India#1184of 1459 in CDM (UNFCCC)#477of 806 in AMS-I.D

4.4/ 10
Integrity
6.0
Transparency
2.5
Claim Safety
5.0
Documentation
3.0

Audit Analysis

A 10 MW small hydro project under CDM with a confirmed investment-test additionality and jurisdictional baseline, but the available record contains only validation-era documents with no monitoring reports or verified emission reductions. The low extraction confidence, absence of post-validation data, and a contradiction in the leakage treatment limit confidence in the project's ongoing performance and claim accuracy.

Red Flags

  • No monitoring reports or verified ERR figures found in any available document — the project's actual performance over its 10-year crediting period (2009–2019) is entirely unverified in the extracted record
  • Ten Corrective Action Requests were raised during validation, indicating notable implementation or documentation issues at project inception
  • Leakage justification is contradictory: the validation report states 'deemed negligible' while an appendix references a 'quantified' treatment, creating ambiguity about whether leakage was actually assessed
  • Minimum extraction confidence is rated low, meaning at least one key document was poorly readable and critical data may be missing

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, 'deemed negligible' but contradicted by appendix

Baseline

Jurisdictional grid EF (2007), standard for CDM hydro

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance mechanism not stated

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-01AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents