10 MW Biomass based renewable energy generation for the grid at ASN Power Projects (P) Limited in Chandrapur District,Maharashtra
#186of 352 in Biomass#794of 975 in India#1186of 1459 in CDM (UNFCCC)#479of 806 in AMS-I.D
Audit Analysis
This 10 MW CDM biomass power project (CDM-2129, India) has a jurisdictional baseline and VVB-confirmed additionality, but the record is severely limited: no monitoring reports or verified emission reductions were found, four corrective action requests were raised at validation, and the extraction confidence is low. The project's crediting period ended in November 2019, yet no post-validation data is available to confirm actual performance.
Red Flags
- Four corrective action requests (CARs) were raised at validation, including missing DNA of India approval, uncorrected electricity generation calculations, and absent Pollution Control Board consents — indicating the project was not fully compliant at the time of validation
- No monitoring reports or verified emission reduction figures were found in the extracted record for a project whose 10-year crediting period ended in November 2019
- Leakage justification is contradictory: the validation report states leakage is 'deemed negligible' (0% deduction) while a financial document references a 'quantified' approach, with no reconciliation in the record
- Minimum extraction confidence is rated 'low', meaning at least one key document was poorly readable, reducing reliability of all extracted figures
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
0% deduction, deemed negligible, contradicted in financial doc
Jurisdictional grid EF, 2006 reference year
Safeguards mentioned but FPIC not conducted; grievance mechanism not stated
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →