10 MW Manjanadka Hydro project, Karnataka, India

CDM-9467 ↗

4.4 / 10
Integrity
4.8
Transparency
4.1
Claim Safety
4.3
Documentation
4.0

Score Breakdown

Integrity

verified Additionality was confirmed by the VVB in the validation report, using an investment test.

missing The validation report recorded many material findings, including several corrective action requests and clarification requests, and no buffer pool or reversal treatment is stated.

Transparency

verified The monitoring period is clearly stated for 2020, and the project is linked to a named VVB, TÜV Rheinland (China) Ltd.

missing Key MRV details are missing or not stated in available documents, including total ERs claimed versus verified, usage monitoring, and any quantified leakage or baseline reassessment.

Claim Safety

verified The project uses a CDM methodology, AMS-I.D Version 17, which provides a recognized accounting framework.

missing The project is marked as CORSIA-eligible, but no CCP status is stated and leakage treatment is not quantified, increasing over-crediting and claim-risk concerns.

Documentation

verified The record includes a validation report and identifies the VVB, with high extraction confidence.

missing Only two evidence documents are reflected in the extracted record, and several core fields are not found in available documents, including buffer pool, verified ER totals, and baseline reassessment.

Detailed Analysis

Integrity

The validation report confirms additionality through an investment test and says it was verified by the VVB, which supports the project’s core crediting logic. However, the same report lists many material findings, including multiple CARs and CLs, and there is no stated buffer pool or quantified reversal treatment, so permanence and robustness are only moderate.

Transparency

The monitoring period for 2020 is clearly identified, and the project is tied to TÜV Rheinland (China) Ltd, which helps traceability. But the extracted record does not state total ERs claimed versus verified, usage monitoring method, or any baseline reassessment, so the MRV picture remains incomplete.

Claim Safety

The project uses AMS-I.D Version 17 under the CDM, which is a recognized methodology, but the claim-safety picture is weakened by missing leakage quantification and no stated usage-rate evidence. The project is marked CORSIA-eligible, while CCP status is not stated, so dual-market claim risk is not fully resolved.

Documentation

The extracted record is based on a validation report and the extraction confidence is high, which is a positive sign. Even so, only a limited set of documents appears to have been used, and several important fields are not found in available documents, including buffer pool, verified ER totals, and baseline reassessment timing.

Overall

I privileged the validation report for additionality and safeguard-related facts because it is the clearest named source in the extracted record, but I treated missing quantified MRV fields conservatively. The contradictions are important: the record says reversal events are not addressed, while a later source reportedly says none were reported; similarly, leakage is described as not addressed in the validation report but later characterized as negligible. I gave more weight to the validation report because it is explicitly identified and dated, and I reduced confidence because these discrepancies indicate reliability issues in the extracted evidence.

Audit Analysis

The project has some positive signs, including VVB-confirmed additionality, FPIC, and a grievance mechanism, but the evidence base is thin and several key safeguards and accounting details are not fully stated. The biggest concerns are the lack of quantified leakage treatment, no buffer pool information, and multiple material findings in the validation report, which reduce confidence in the crediting claims.

Project Description

Status: Registered Type: PA Methodology: AMS-I.D. Project type: Hydro Sub-type: New dam Region: Asia & Pacific Sub-region: Southern Asia Reductions 1st period: 29.655 ktCO2e/yr

Red Flags

  • The validation report lists many material findings, including multiple CARs and CLs, which suggests significant issues were identified during validation.
  • Leakage treatment is not properly documented: the report says there is no leakage associated with the project activity, but the extracted record also shows leakage justification as not addressed and no quantified deduction.

Credit Vintages

Issued Retired Available
2022
93,376 0 93,376
Total 93,376 0 93,376

Cosa migliorerebbe questo punteggio

  • Provide a complete monitoring and verification package showing verified ER totals, leakage treatment, and any baseline reassessment or justification for not reassessing.
  • Disclose permanence and claim-risk controls, including buffer pool treatment if applicable, reversal monitoring, and clear confirmation of CCP status or other market-claim restrictions.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

No buffer pool stated

Leakage

Leakage not quantified

Baseline

Project baseline, reassessment missing

Safeguards

FPIC and grievance mechanism present

Double-claim

CORSIA-eligible; CCP status unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-13 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti