10 MW Solar Power Project by EVOLUA: MAR and NP
#482of 770 in Renewable energy#83of 104 in Brazil#40of 421 in Universal Carbon Registry (UCR)#184of 416 in AMS-I.D
Audit Analysis
A 10 MW solar PV project in Brazil using a jurisdictional baseline and the well-established AMS-I.D. methodology, with no material findings or corrective actions. However, the available record consists solely of a PDD with no verification report, no monitoring report, and no identified VVB, leaving additionality verification and ERR validation unconfirmed. The project type carries inherently low permanence risk, but the documentation gap limits confidence in the overall claim.
Red Flags
- No verification report or monitoring report found in the extracted record; total ERR verified is not stated, so the claimed 28,239.25 tCO₂e cannot be independently validated
- VVB name is not identified in any available document, making it impossible to confirm independent third-party verification
- Additionality test type is not stated in the extracted PDD data, leaving the basis for additionality unconfirmed
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
Test type not stated; VVB unconfirmed
Solar avoidance; low inherent reversal risk
0% deemed negligible; reasonable for grid-connected solar
Jurisdictional method stated; reassessment timing not found
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status both not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →