Skip to main content
ScoredGCCIndiaRegistry: RegisteredGeneral Methodologyv2.1

10 MW Solar Power Project by SECI

Developer: Solar Energy Corporation of India Ltd

GCC-328 ↗

#1094of 4106 in Renewable energy#556of 2340 in India#115of 232 in Global Carbon Council (GCC)

Assessment

CarbonMeld document-based assessment

01020304 Overall 5.9 / 10 Dimension scores are locked — the faint arcs are empty tracks, not zero scores.

Scale 0–10 · method weights: integrity 35% · transparency 25% · claim safety 25% · documentation 15%.

Analysis

A 10 MW solar PV project by SECI (a government entity) under the GCC standard with a jurisdictional baseline and VVB-confirmed investment additionality test. The project design is sound, but the absence of any monitoring or verification data and the low extraction confidence in source documents limit confidence in actual performance. CORSIA eligibility without a stated CCP position introduces a dual-channel risk that should be clarified.

Red Flags

3 red flags detected — Unlock with Premium

Findings

Risk Indicators

Additionality

🔒

Permanence

🔒

Leakage

🔒

Baseline

🔒

Safeguards

🔒

Double-claim

🔒

Risk indicator details are a Premium feature

Score Breakdown

Score factors per dimension are a Premium feature — Unlock with Premium

Detailed Analysis

The detailed per-dimension analysis is a Premium feature — Unlock with Premium

Evidence

Eligibility & market

What can you claim with this credit?

Four checks buyers ask about, from the registry and the Integrity Council (ICVCM).

  • Airlines (CORSIA)

    Pilot phase only (2021–2023)

    Eligible only for the pilot phase: not usable for the current 2024–2026 phase.

    Source: registry label

  • Integrity label (ICVCM CCP)

    No ICVCM information

    No CCP label and no ICVCM decision found for this project's methodology.

  • Removal or reduction

    Emission reduction or avoidance

    Prevents or reduces emissions — fits contribution claims, not SBTi neutralisation.

    Source: project sector

  • Paris Agreement (Article 6)

    Not published

    This registry does not publish Article 6 authorizations.

Information only, from public sources. Claim rules (CORSIA, SBTi, EU rules on green claims) change: check them before making a public claim. Since 27 September 2026, EU consumer rules do not allow “climate neutral” product claims based on offsets.

Registry labels last checked:2026-09-27

Credit Vintages

Issuance data not yet available — check back soon.

Where to buy

Got an offer for these credits? Check it against the registry →

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

Profile & governance

Analysis ProvenanceGeneral Methodologyv2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected] →

Contest this rating

Something wrong in the analysis, or a registry document we have not used? Send us the link to the public source: you get a reference and an answer within 30 days.

Contest this rating →